Surface telematics and video events for a supervisor's coaching conversation, with the record behind each one attached, and keep the score out of hiring, discipline and discharge.
Base rates differ by route before any model runs. Night and long-haul work triggers far more often than regional daytime work, so a flag there means less. Nestack reports the dismissed-flag rate by route type, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Night and long-haul runs
8.2%
3.4×
Review
Urban stop-and-go routes
5.5%
2.3×
Review
Winter and wet conditions
4.3%
1.8×
Watch
Regional daytime runs
2.2%
0.9×
Normal
Bar: dismissed-flag-rate lift vs. regional-daytime baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
A cycle ends in a standing case
Explaining a bad flag does not close the cycle. A standing regression case does, and that suite is what the next event flagged is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Dismissed flags rise in one route type.
02Diagnose
If the flag was wrong, the event, the record behind it and the coaching note are read back together until the cause is one thing.
03Improve
The fix is versioned against the events that produced it.
04Verify
The release stops until every affected case is passing.
05Learn
The case stays in the suite, and the coaching policy is amended.
Learn → DetectThe return edge. The next event flagged is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, feeds, coaching workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Coaching workflow discovery and boundary definition.
02Telematics, video and ELD source review.
03Trigger, exposure and coaching-policy rule mapping.
04Event ingestion and record normalisation.
05Cause grouping and exposure logic.
06Confidence scoring and event routing.
07Supervisor coaching workflow.
08Telematics and video integration.
09False-flag regression cases.
10Guardrails and employment controls.
11Event-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne terminal, one fleetProductionProduction telematicsAdvancedMultiple terminals / fleets
Introduced at Pilot
Surfacing events to your coaching rules✓✓✓
Supervisor coaching gate✓✓✓
Flag-precision baseline✓✓✓
Introduced at Production
Reporting by event type—✓✓
Coaching workflow in your systems—✓✓
Approved record write-back—✓✓
Telematics integration—✓✓
Introduced at Advanced
Multi-state and union rule sets——✓
Multi-stage safety approvals——✓
High event volume——✓
Multi-terminal coaching controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your coaching policy and who holds the conversation→Coaching-rule mapping and the employment-use boundaryWeek 1
02Representative events, including the ones you dismissed→Flag baseline, cause grouping and exposure notesWeek 2
03Your route, duty and equipment mix→Exposure mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports→Telematics, video and ELD assessment, then integration setupWeek 2
05Flags you would not want acted on→False-flag cases and the evaluation suiteWeek 4
06What must reach a supervisor before it touches employment→Confidence scoring, event routing, guardrails and employment-use controlsWeek 3
07Named supervisors to coach on events→Supervisor coaching workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases occupy the weeks the work really needs, so week 5 runs evaluation and launch side by side.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Coaching workflow discovery, rule mapping and the automation boundaryW2Telematics integration and the flag baselineW3Coaching workflow, confidence logic and supervisor controlsW4Evaluation suite, false-flag cases and failure-mode testingW5Video integration, pilot terminals and targeted correctionsW6One coaching cycle run under safety, then handover
Reading the bandA bar runs across the weeks its work is named in and no more. The week 5 overlap is real work, not padding.
At the end of W6The cycle closes validation and Agent Care picks up the monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Transportation AI agent
Build a coaching agent around the supervisor who holds the conversation.
If you show us your coaching policy, your event feeds and who holds the conversation, we'll map the workflow, set the automation boundary and name what never touches employment.