Start the right Part 4 clock for the provider class this outage falls in, assemble the threshold arithmetic with the systems each figure came from, and leave the oath to a named person.
A fault is discovered at 02:14, and every Part 4 clock runs from that moment, not from the ticket.
02
A provider class is read first — 47 CFR 4.9(g) gives interconnected VoIP no Initial Report at all.
Reason
03
A VoIP user-minute trigger also wants complete loss of service, a bar no other class is held to.
04
A 911 or 988 facility is hit, and § 4.9(h) has run a thirty-minute clock since 15 April 2025.
05
An activation is announced, and § 4.18(a) has been mandatory only since 20 February 2025.
Decide
06
A daily DIRS report is owed even when the reportable infrastructure has not changed since yesterday.
07
A waiver is read per outage — § 4.18(b) holds only if the first daily report falls due first.
Out
08
A Final Report is deposed to on oath under § 4.11 by a person authorised to bind the provider.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent watches and assembles; a named person authorised to bind the provider deposes on oath, files the report, and the provider answers for it.
Example workflow
One outage, discovery to filing
AgentHuman
1Discovery timestamp receivedAlarm records, a NOC ticket, element logs or a field report
2Provider class and clocks setWireline, wireless, cable, satellite or interconnected VoIP, each on the § 4.9 paragraph it answers to
3Reports draftedThe Notification, the Initial Report where a class has one, and the Final Report
4Controls appliedClock checks, waiver checks that never reach the 911 and 988 notices, and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is filed at any of them — the agent is drafting, and the duty lane opens at the completeness gate.
5DecisionBranches at the completeness gate
Arithmetic sound
Goes to the authorised filer to depose.
Anything thin
Adds a regulatory counsel read first.
Duty officer review
The draft is held with its clocks, the two-hour follow-up and the arithmetic behind it.
Depose and file · Append evidence · Send to counsel
Filed — by an authorised person▼
6Outage and case records updatedOnly where write access and § 4.2 confidentiality allow it
7Outcome evaluatedClock margin, arithmetic provenance, counsel corrections and what review found
Corrections
Each counsel correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Deposing on oath under 47 CFR 4.11.
Filing a Notification, Initial or Final Report.
Notifying a 911 or 988 special facility direct.
Deciding the user-minute threshold was not met.
Automation boundaryAgent acts unaided
✓Read the discovery moment from the system that first raised it.
✓Start the clock that 47 CFR 4.9 sets for the provider class involved.
✓Assemble the user-minute arithmetic and name each source system.
✓Draft the Notification and the reports that provider class owes.
Nothing is filed or deposed except by an authorised person, inside agreed boundaries.
Judging an outage outside the 47 CFR 4.3 list.
Telling a PSAP that service has been restored.
Deciding a DIRS activation waives a NORS filing.
Changes to clock rules or report templates.
Example output
One outage, annotated
Our NOC incident agent names the cause; this record is the filing, and the clock ran before any cause was known.
Report draft · single outageIllustrative example
Outage
Drafted as
Clock
Evidence of record
Confidence
Held for
Transport fault, wireline metro
Notification under § 4.9(f), thresholds met
Minute 41 from discovery
Alarm and mediation records, 14 August 2026
Held unfiled
The authorised filer, in person
As receivedTaken from the alarm log and the mediation counts — the arithmetic reaches as far as those records do.
What the record holdsDiscovery timestampUser-minute arithmeticDIRS activation status
Why no threshold call hereThreshold judgement sits with the person who deposes under § 4.11.
ActionDepose and fileAppend evidenceSend to counsel
What the score decidesA draft under the configured threshold picks up a counsel read before the filer sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every outageFrom the alarm that raised it
03Evidence
One discovery, two filings
Our outage communication agent drafts the customer notice from this same discovery; this page is the regulator filing, on other clocks and with another signer.
01Approved path
One event, several clocks
Wireline, wireless, cable and satellite run 120 minutes, 72 hours and 30 days; § 4.9(g) gives interconnected VoIP 240 minutes, 24 hours and no Initial Report.
02Human review
What was found, and what was not
No FCC rule reaches outage reporting for broadband internet access service, and no 2025 or 2026 enforcement for a late or missing NORS or DIRS filing was found.
04Build an evidence trail
The outage, the class it falls in and the person who deposed on oath stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
A class-level clock-adherence figure can read clean while one provider class takes most of the corrections. Nestack reports the counsel-correction rate by provider class, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Interconnected VoIP service
9.1%
3.6×
Review
Cable circuit-switched telephony
6.6%
2.6×
Review
Wireless network operations
4.1%
1.6×
Watch
Wireline incumbent operations
1.7%
0.7×
Normal
Bar: counsel-correction-rate lift vs. wireline-operations baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What an unreconstructable filing costs
A cycle is done when the wrong provider clock has become a case the next release must pass. That suite is what the next report built is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Counsel-correction rate rises in one provider class.
02Diagnose
The engineer who knew at 02:14 and the form that thought discovery was at 06:00 are read back until one cause remains.
03Improve
Number the change; the outages that drove it are filed under it.
04Verify
Each touched class case is run once more, and one red holds it back.
05Learn
It stays on as a standing test, and the threshold rules move with it.
Learn → DetectThe return edge. The next report is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, report assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Outage-reporting workflow discovery and boundary work.
02Alarm, ticket and mediation sources.
03Provider-class and threshold-arithmetic mapping.
04Discovery-evidence ingestion.
05Class, clock and record binding.
06Completeness scoring and counsel routing.
07Authorised filer workflow.
08Alarm and case-system integration.
09Threshold and clock cases.
10Guardrails and deposition controls.
11Outage-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne provider class, one regionProductionProduction reporting workflowAdvancedMultiple classes / regions
Introduced at Pilot
Report drafting to your clocks✓✓✓
Authorised-filer deposition✓✓✓
Threshold-arithmetic baseline✓✓✓
Introduced at Production
Reporting by provider class—✓✓
Filing workflow in your systems—✓✓
Approved write-back—✓✓
Alarm-system integration—✓✓
Introduced at Advanced
Multi-class reporting duties——✓
Cross-class evidence packs——✓
High outage volume——✓
Multi-clock notification controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your network alarms and outage tickets→Discovery capture and clock bindingWeek 1
02Representative outages and their counts→Threshold arithmetic, source binding and the draft baselineWeek 2
03Your provider classes and filing channels→Provider-class, clock and channel mapping and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Alarm, ticket and mediation assessment, then integration setupWeek 2
05Reports you would not want deposed to→Threshold cases and failure testingWeek 4
06What no outage report may conclude→Completeness scoring, counsel routing, guardrails and filing controlsWeek 3
07A person authorised to bind the provider→Authorised-filer workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band is the honest working time a phase takes, and the fifth is shared because the work itself is.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Outage reporting discovery, clock mapping and the automation boundaryW2Source integration and the threshold-arithmetic baselineW3Report assembly, class logic and filing controlsW4Evaluation suite, threshold cases and failure-mode testingW5Alarm integration, pilot outages and targeted correctionsW6One activation season run under the duty officer, then Agent Care handover
Reading the bandA bar runs only across the weeks its own work is named in. The fifth week doubles because two phases share it.
At the end of W6When the outage record validates, Agent Care takes the agent on.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Telecom AI agent
Build the automated outage-report trigger a 2024 consent decree promised.
Show us how a fault reaches you today and who deposes on the Final Report. That deposition has to survive a read-back against the alarm log months later, on a clock that started at discovery. A 2024 consent decree ran on a notification filed late and maintenance never reported.