Build the evidence file behind each household under the programme rules that unit sits in, run the correction clock the agency opens, and hold the annual pack for the owner, who certifies.
A property-level evidence-completeness figure can read well while one set-aside or household type carries most of the open gaps. Nestack reports completeness by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Over-income households
8.7%
3.7×
Review
Average-income set-aside
6.4%
2.7×
Review
Mixed-finance households
3.5%
1.5×
Watch
Stable-income households
1.2%
0.5×
Normal
Bar: gap-rate lift vs. stable-income baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Each cycle closes by adding a case
A cycle closes when the missed recertification is a regression case. That suite is what the next year certified is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Evidence completeness falls in a set-aside slice.
02Diagnose
The unit that was compliant on paper and not in fact is read back through its file until the cause narrows to one.
03Improve
The fix carries a number, and the files that forced it travel with it.
04Verify
Nothing goes out until every touched household case has passed again.
05Learn
It is kept permanently, and the eligibility rules are amended alongside it.
Learn → DetectThe return edge. The next cycle is detected against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, file workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Compliance workflow discovery and boundary definition.
02Property and agency source assessment.
03Programme rule, agency calendar and retention mapping.
04Tenant-file ingestion and normalisation.
05Evidence assembly and citation binding.
06Confidence scoring and gap routing.
07Owner sign-off workflow.
08Property and agency system integration.
09Eligibility and recertification cases.
10Guardrails and owner-certification controls.
11Household-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne property, one agencyProductionProduction property systemsAdvancedMultiple states / programmes
Introduced at Pilot
Assembly to your files and rules✓✓✓
Owner sign-off hold✓✓✓
Evidence-completeness baseline✓✓✓
Introduced at Production
Reporting by set-aside—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Property-system integration—✓✓
Introduced at Advanced
Mixed-finance rule sets——✓
Multi-stage owner reviews——✓
High unit counts——✓
Multi-programme certification controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your tenant files and unit designations→Tenant-file ingestion and evidence mappingWeek 1
02Representative certified households→Assembly baseline, citation binding and gap detectionWeek 2
03Your programme rules and agency calendars→Programme, agency-calendar and retention mappingWeek 1
04Access to relevant APIs, feeds or exports→Property and agency source assessment, then integration setupWeek 2
05Files you would not want sampled→Correction cases and the evaluation suiteWeek 4
06What no owner certification may assume→Confidence scoring, gap routing, guardrails and sign-off controlsWeek 3
07Named owner representatives to review files→Owner sign-off workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Weeks the work truly needs set each of these widths, which is why the fifth band is not one but two.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Compliance workflow discovery, rule mapping and the automation boundaryW2Source integration and the assembly baselineW3File workflow, confidence logic and sign-off controlsW4Evaluation suite, correction-clock checks and failure-mode testingW5Agency-system integration, pilot files and targeted correctionsW6One certification year run under the ownership entity, then Agent Care handover
Reading the bandEach bar sits only on the weeks its work is named in. The week 5 overlap is real work, not padding.
At the end of W6The final checks clear on live files and monitoring moves to Agent Care.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Real Estate AI agent
Build a compliance-file agent around the owner certification.
Show us your programme mix, your agency calendars and who signs. Ask who certifies at the end of it, and the answer does not move: the owner does, under penalties of perjury, on all twelve propositions in 26 CFR 1.42-5(c)(1). We map the assembly workflow, run the correction clock into the Form 8823 window the agency opens no earlier than that period ends and no later than 45 days after it, and name what stays with a person.