Trace the exposure record behind a sample — plan coverage, calibration, custody and the clocks a result starts — and hold it for the hygienist, while a physician makes every medical determination.
A programme-level sampling-coverage figure can read complete while a few exposure groups carry nearly all of the unusable samples. Nestack reports the unusable-sample rate by group, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Contractor maintenance crews
8.2%
3.7×
Review
Blast crews and drillers
5.9%
2.7×
Review
Pre-strip and haul operators
3.2%
1.5×
Watch
Designated-area sampling
1.1%
0.5×
Normal
Bar: unusable-sample lift vs. the designated-area baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
The loop ends in a regression case
The loop shuts when the voided sample is a regression case. That suite is what the next result returned is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Unusable samples rise in one exposure group.
02Diagnose
The pump the worker took off at crib and nobody recorded is read back until one cause remains.
03Improve
Any change ships numbered, with the results that caused it attached.
04Verify
One exposure case still failing is enough to hold the release.
05Learn
One case joins the suite, one line joins the exposure record.
Learn → DetectThe return edge. Detection next time starts from a longer suite than this one.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, assembly workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Exposure workflow discovery and boundary setting.
02Sampling and laboratory source assessment.
03Sampling plan, clock and retention rule mapping.
04Sample and result ingestion, normalised.
05Coverage comparison and source binding.
06Confidence scoring and exception routing.
07Hygienist review workflow.
08Laboratory and roster integration.
09Sampling and notification cases.
10Guardrails and privacy controls.
11Exposure-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne site, one exposure groupProductionProduction sampling systemsAdvancedMultiple sites / schemes
Introduced at Pilot
Assembly to your sampling plan✓✓✓
Hygienist review gate✓✓✓
Sampling-coverage baseline✓✓✓
Introduced at Production
Reporting by exposure group—✓✓
Review routing in your systems—✓✓
Approved write-back—✓✓
Laboratory-result integration—✓✓
Introduced at Advanced
Multi-scheme sampling rules——✓
Multi-stage hygiene approvals——✓
High sampling volume——✓
Multi-site retention controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your sampling plan and exposure-group structure→Sample and result ingestion and evidence mappingWeek 1
02Representative laboratory reports and calibration logs→Assembly baseline, coverage extraction and source bindingWeek 2
03Your clocks, retention periods and certification register→Clock, retention and certification mapping, and the boundaryWeek 1
04Access to relevant APIs, feeds or exports→Sampling and laboratory assessment, then integration setupWeek 2
05Records you would not want subpoenaed→Pump-calibration cases and failure testingWeek 4
06What no notification may withhold→Confidence scoring, exception routing, guardrails and privacy controlsWeek 3
07Named hygienists to read the records→Hygienist review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Every band is exactly as wide as the weeks its phase consumes, so the fifth legitimately carries two.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Exposure workflow discovery, plan mapping and the automation boundaryW2Laboratory integration and the assembly baselineW3Assembly workflow, confidence logic and review controlsW4Evaluation suite, privacy controls and failure-mode testingW5Roster integration, pilot exposure groups and targeted correctionsW6One monitoring cycle run under the occupational hygienist, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The week 5 doubling is two phases at once.
At the end of W6Once the sampling round validates, Agent Care assumes the agent.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build an exposure-record agent around your sampling plan and your hygienist.
Show us your sampling plan, your calibration logs and your clocks. Not a system that reads a medical result — one that assembles the record around it and dates what is contested, including the 2024 silica rule, whose compliance dates were stayed as at 18 August 2026.