Nestack Agent Care
Industries / Mining / Ground control records

Mining AI agent · Ground control records

Ground Control Decision-Record AI Agent

Reconstruct what the monitoring showed when a ground decision was taken, which trigger rule was in force that day and who was notified — the statutory official on shift decides the ground.

4–6 weeksTypical delivery
Your stackDeployment
Post-decisionNamed officials
Agent CareAfter launch

What this agent does

Reconstructs the record, not the decision

In
01

A trigger is crossed, and the reading is pulled from supported seismic, radar, extensometer and survey sources.

02

A threshold is read against the trigger table in force on the day, not the table that is in force now.

Reason
03

An alarm fires, and the escalation the plan required at that level is set beside the notifications that went out.

04

A re-entry is called, and the record holds the named official, the stated basis and the clock they ran.

05

An exclusion zone is declared, and the basis for declaring it and for releasing it are both carried forward.

Decide
06

A plan review falls due, and the cycle applied is the one that jurisdiction sets, not one cadence group-wide.

07

A sector is mined, and the approval covering it is read against the rock mass actually being extracted.

Out
08

Support is installed, and the as-installed record is reconciled against the design revision it was cut from.

09

A write action runs only inside the approval boundaries agreed during implementation.

Product statement

The agent reconstructs the record; a named statutory official decides the ground, and a record found wrong is corrected after people were already underground.

Example workflow

One decision, alarm to record

AgentHuman
1Alarm or trigger receivedSeismic system, radar, extensometer, inspection and shift records
2Record assembledTriggers in force, plan requirements, notifications and roster, each with its named source
3Pack draftedDecision window, escalation record, open items and confidence
4Controls appliedTrigger-version checks, escalation-rule tests, notification completeness and confidence threshold
No human action required

Stages 1 to 4 run unaided, and nothing is decided at any of them — the agent is reconstructing a record, and the official lane opens at the confidence gate.

5DecisionBranches at the confidence threshold
High confidence

Goes to the statutory official.

Low confidence

Adds a geotechnical read first.

Official review

The pack is held with its readings, its open items and the confidence.

Approve · Amend · Send to geotechnical review
Approved — released to the record
6Ground control record updatedOnly where write access and approval policy allow it
7Outcome evaluatedAmendment distance, open-item outcomes, review findings and post-decision corrections
Amendments

Every official amendment is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required8 items
Predicting a ground failure or a rockburst.
Clearing a re-entry, or lifting an exclusion.
Setting, tuning or re-baselining a trigger level.
Certifying a ground support design.
Automation boundaryAgent acts unaided
Reconstruct the decision window from the record the shift saw.
Set each reading against the trigger table in force that day.
Name who the plan required to be told, and whether they were.
Reconcile designed support against installed, and hold the pack.
Writes run only inside the boundaries agreed at implementation, and never ahead of a decision.
Raising, suppressing or standing down an alarm.
Authorising the plan — the named statutory role.
Notifying the inspectorate of a ground event.
Changes to trigger, escalation or approval rules.

Example output

One ground decision, annotated

Everything the agent reconstructs is attached to the record it was drawn from.

Decision record output · single decisionIllustrative example
Ground domain
Decision reconstructed
Time to escalation
Source of record
Confidence
Decision of record
Seismically active panel
Re-entry authorised after a seismic exclusion
41 minutes
Seismic catalogue on file
88%
Underground manager, named on shift
As receivedTaken from the shift log and the event catalogue — nothing on this side is written by the agent.
Source facts used Trigger table, versioned Shift notification log Seismic event record
Why this is openThe plan required a geotechnical escalation at that level, and the log does not show one.
ActionApproveAmendSend to geotechnical review
What the score decidesBelow the configured threshold the item picks up a geotechnical read before the official sees it.

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value landsValue 01 – 04
Every ground decisionFrom the monitoring record
03Reconstruction

Rebuild the decision window

Readings are placed beside the trigger table in force that day, and beside the plan requirement that applied at that level.

01Approved path

Reconstruct what was known

Press reporting of the Sernageomin El Teniente report puts the failure in a missing mandatory escalation, not in the array. The agent shows which rule was in force.

02Human review

Not the alarm, and not the permit

Our process control copilot works the live plant loop; our safety compliance assistant owns the SWMS, isolation and permit packs. This page owns the basis of a ground decision.

04Build an evidence trail

The alarm, the plan it was read against and the official who decided stay on the record.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

Seismic monitoringIMS · ESG Solutions
Microseismic arrays
Deformation monitoringSlope stability radar
Extensometers · prisms
Mine planning and surveyDeswik · Vulcan
As-mined survey data

Agent

Ground control decision record

Reads the record
Rebuilds the window
Holds for review

Plans and shift recordsGCMP · TARP · SRMP files
Shift logs and rosters
Observability & evaluationOpenTelemetry · Langfuse
Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six layers between the model and the record

Each of the six sits within the last. What none of them holds shows in the map beneath this.

L6 · Outermost — last line of defenceInward → L1 · closest to the model
L6Rollback / safe modeNarrow to record reconstruction when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt, trigger-table and plan-version changes.Track
L4TraceabilityRecord the readings, the rules applied, the open items and the approval time.Record
L3Official approvalHold the pack for the named statutory official; it governs release of the pack, not whether the ground held.Gate
L2Policy guardrailsTest the pack against the escalation and review-cycle rules on file; a failure returns the pack.Restrict
L1Confidence thresholdsRoute low-confidence items to a geotechnical read before the official sees them.Require review
Model corePack assembled — decision window, escalation record, open items and confidence
L1 – L2Test whether the pack may stand
L3Puts the release in the hands of an official
L4 – L5Keep the alarm and the plan behind it
L6Narrows to record reconstruction when signals degrade

How Nestack evaluates it

Evaluate the reconstruction workflow — not only the finished pack.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the record the official reads
Depth of coverage ▼
E1Final-output evaluationDid every item trace to the reading or record behind it?
E2Step-level evaluationDid the agent use the trigger table and plan version in force that day?
E3Tool evaluationDid it read and write the correct panel and the correct shift?
E4Confidence calibrationDo low-confidence items actually attract more official amendments?
E5Slice evaluationHow does performance change across specific ground domains?
E6Business outcomeHow many items were amended, or corrected after the decision had been acted on?
Floor — the outcome the operator answers for

Failure modes

Where each failure originates in the agent

Seven failure modes, each placed where it first enters the record.

Agent lifecycleDirection of processing →
01 · Retrieval1 mode
DW-03

Post-processed catalogue

The raw feed the control room saw is not the one read.

Stage gathersReadings, trigger tables, plan versions and logs
02 · Reasoning2 modes
DW-04

Superseded trigger table

A revised level is applied back across the year.

DW-06

Design reconciled to itself

The plan changed and the model was never told.

Stage proposesDecision window, escalation record, confidence
03 · Tool / write2 modes
DW-02

Zone declared verbally

A zone has a start with no recorded basis.

DW-05

Notification to a vacant role

The plan named a role the roster left empty.

Stage writesOnly where write access and approval policy allow it
04 · Output1 mode
DW-01

Escalation not evidenced

The plan required a call the log cannot show.

Stage returnsThe decision record the statutory official reads
05 · Change / Version1 mode
DW-07

Silent threshold drift

A model or rule change alters what reads as out of range.

Stage tracksModel, prompt, trigger tables and plan versions
Sev-1 · a wrong pack reaches a decision Sev-2 · a wrong basis reaches the record Sev-3 · source degrades, item goes to review

Affected slices

One ground domain can carry most of the returns

A panel-level reconstruction rate can read as complete while a few ground domains carry most of the returned items. Nestack reports the return rate by ground domain, not only in total.

Slice performance — reported separately, not only in aggregateIllustrative example
SliceFailure rateLift Lift vs. thresholdStatus
Seismically active panels6.6%3.7× Review
Block-cave drawpoint ground4.5%2.5× Review
Development and access drives2.7%1.5× Watch
Stable, supported ground1.8%1.0× Normal
Bar: return-rate lift vs. stable-ground baseline · scale 0–4.0× · tick marks the 2.0× review threshold 2 of 4 slices over threshold

Evidence-linked improvement

Each cycle leaves one more standing test

A cycle is done when the lost decision trail has become a case the next release must pass. That suite is what the next re-entry logged is measured against.

Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect

Return rate rises in one ground domain.

02Diagnose

The alarm that fired at two in the morning and was explained six months later is read back until the cause narrows to one.

03Improve

Stamp the change; the decisions behind it are filed against that number.

04Verify

Each touched decision case is run again, and one red stops the release.

05Learn

It stays a standing test, and the trigger rules move with it.

Learn → DetectThe return edge. Detection next time runs against one more case than last.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, reconstruction workflow, evaluation, integration, then production validation and handover.

Workstream Week 1Week 2Week 3Week 4Week 5Week 6
01Decision workflow discovery and boundary mapping.
02Monitoring and plan-source assessment.
03Trigger, escalation and review-cycle rule mapping.
04Reading ingestion and reconciliation.
05Decision-window assembly and binding.
06Confidence scoring and exception routing.
07Official review workflow.
08Monitoring and plan-system integration.
09Alarm and decision cases.
10Guardrails and escalation controls.
11Decision-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tier PilotOne panel, one cycle ProductionProduction monitoring systems AdvancedMultiple mines / jurisdictions
Introduced at Pilot
Decision-record reconstruction
Statutory-official approval
Reconstruction-completeness baseline
Introduced at Production
Reporting by ground domain
Exception workflow in your systems
Approved write-back
Monitoring-system integration
Introduced at Advanced
Multi-jurisdiction plan rules
Multi-stage ground approvals
High panel count
Multi-panel decision controls
Build price From $5,000 From $8,000 Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, panel count, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

You bringWe build with it
01Your panels, ground domains and plans Trigger, escalation and review-cycle rule mappingWeek 1
02Representative prior decision records Reading ingestion, reconciliation and the reconstruction baselineWeek 2
03Your GCMP, TARPs and re-entry protocols Decision-record mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports Monitoring and plan-source assessment, then integration setupWeek 2
05Decisions you would not want reconstructed Re-entry cases and the evaluation suiteWeek 4
06What no ground decision may omit Confidence scoring, exception routing, guardrails and escalation controlsWeek 3
07Named statutory officials to review the pack Official review workflow, then pilot and production validationWeeks 5–6
Nothing else is required Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

The widths come from the weeks the work actually occupies, which is the reason that week five overlaps.

Phase W1W2W3W4W5W6
Discovery W1
Build W2 – W3
Evaluate W4 – W5
Pilot & Launch W5 – W6
Week focus W1Decision workflow discovery, rule mapping and the automation boundary W2Source integration and the reconstruction baseline W3Reconstruction workflow, confidence logic and review controls W4Evaluation suite, escalation checks and failure-mode testing W5Monitoring integration, a pilot panel and targeted corrections W6One review cycle run under the statutory mine manager, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The week 5 overlap is real, not padding.
At the end of W6Validation closes on live panels, and Agent Care picks up monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Mining AI agent

Build the ground decision record before someone hostile asks for it.

Show us your monitoring feeds, your trigger tables and the plan that governs escalation. The next step is one panel and one month: we reconstruct the ground decisions inside it, name what the record cannot answer, and set the automation boundary with you — the officials keep the decisions.

Nestack Agents · Ground control decision recordAGT-MN-14 · Agent Care available after launch