Reconstruct what the monitoring showed when a ground decision was taken, which trigger rule was in force that day and who was notified — the statutory official on shift decides the ground.
A trigger is crossed, and the reading is pulled from supported seismic, radar, extensometer and survey sources.
02
A threshold is read against the trigger table in force on the day, not the table that is in force now.
Reason
03
An alarm fires, and the escalation the plan required at that level is set beside the notifications that went out.
04
A re-entry is called, and the record holds the named official, the stated basis and the clock they ran.
05
An exclusion zone is declared, and the basis for declaring it and for releasing it are both carried forward.
Decide
06
A plan review falls due, and the cycle applied is the one that jurisdiction sets, not one cadence group-wide.
07
A sector is mined, and the approval covering it is read against the rock mass actually being extracted.
Out
08
Support is installed, and the as-installed record is reconciled against the design revision it was cut from.
09
A write action runs only inside the approval boundaries agreed during implementation.
→Product statement
The agent reconstructs the record; a named statutory official decides the ground, and a record found wrong is corrected after people were already underground.
Example workflow
One decision, alarm to record
AgentHuman
1Alarm or trigger receivedSeismic system, radar, extensometer, inspection and shift records
2Record assembledTriggers in force, plan requirements, notifications and roster, each with its named source
3Pack draftedDecision window, escalation record, open items and confidence
4Controls appliedTrigger-version checks, escalation-rule tests, notification completeness and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is decided at any of them — the agent is reconstructing a record, and the official lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the statutory official.
Low confidence
Adds a geotechnical read first.
Official review
The pack is held with its readings, its open items and the confidence.
Approve · Amend · Send to geotechnical review
Approved — released to the record▼
6Ground control record updatedOnly where write access and approval policy allow it
7Outcome evaluatedAmendment distance, open-item outcomes, review findings and post-decision corrections
Amendments
Every official amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Predicting a ground failure or a rockburst.
Clearing a re-entry, or lifting an exclusion.
Setting, tuning or re-baselining a trigger level.
Certifying a ground support design.
Automation boundaryAgent acts unaided
✓Reconstruct the decision window from the record the shift saw.
✓Set each reading against the trigger table in force that day.
✓Name who the plan required to be told, and whether they were.
✓Reconcile designed support against installed, and hold the pack.
Writes run only inside the boundaries agreed at implementation, and never ahead of a decision.
Raising, suppressing or standing down an alarm.
Authorising the plan — the named statutory role.
Notifying the inspectorate of a ground event.
Changes to trigger, escalation or approval rules.
Example output
One ground decision, annotated
Everything the agent reconstructs is attached to the record it was drawn from.
Decision record output · single decisionIllustrative example
Ground domain
Decision reconstructed
Time to escalation
Source of record
Confidence
Decision of record
Seismically active panel
Re-entry authorised after a seismic exclusion
41 minutes
Seismic catalogue on file
88%
Underground manager, named on shift
As receivedTaken from the shift log and the event catalogue — nothing on this side is written by the agent.
Source facts usedTrigger table, versionedShift notification logSeismic event record
Why this is openThe plan required a geotechnical escalation at that level, and the log does not show one.
ActionApproveAmendSend to geotechnical review
What the score decidesBelow the configured threshold the item picks up a geotechnical read before the official sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every ground decisionFrom the monitoring record
03Reconstruction
Rebuild the decision window
Readings are placed beside the trigger table in force that day, and beside the plan requirement that applied at that level.
01Approved path
Reconstruct what was known
Press reporting of the Sernageomin El Teniente report puts the failure in a missing mandatory escalation, not in the array. The agent shows which rule was in force.
02Human review
Not the alarm, and not the permit
Our process control copilot works the live plant loop; our safety compliance assistant owns the SWMS, isolation and permit packs. This page owns the basis of a ground decision.
04Build an evidence trail
The alarm, the plan it was read against and the official who decided stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
A panel-level reconstruction rate can read as complete while a few ground domains carry most of the returned items. Nestack reports the return rate by ground domain, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Seismically active panels
6.6%
3.7×
Review
Block-cave drawpoint ground
4.5%
2.5×
Review
Development and access drives
2.7%
1.5×
Watch
Stable, supported ground
1.8%
1.0×
Normal
Bar: return-rate lift vs. stable-ground baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Each cycle leaves one more standing test
A cycle is done when the lost decision trail has become a case the next release must pass. That suite is what the next re-entry logged is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Return rate rises in one ground domain.
02Diagnose
The alarm that fired at two in the morning and was explained six months later is read back until the cause narrows to one.
03Improve
Stamp the change; the decisions behind it are filed against that number.
04Verify
Each touched decision case is run again, and one red stops the release.
05Learn
It stays a standing test, and the trigger rules move with it.
Learn → DetectThe return edge. Detection next time runs against one more case than last.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, reconstruction workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Decision workflow discovery and boundary mapping.
02Monitoring and plan-source assessment.
03Trigger, escalation and review-cycle rule mapping.
04Reading ingestion and reconciliation.
05Decision-window assembly and binding.
06Confidence scoring and exception routing.
07Official review workflow.
08Monitoring and plan-system integration.
09Alarm and decision cases.
10Guardrails and escalation controls.
11Decision-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne panel, one cycleProductionProduction monitoring systemsAdvancedMultiple mines / jurisdictions
Introduced at Pilot
Decision-record reconstruction✓✓✓
Statutory-official approval✓✓✓
Reconstruction-completeness baseline✓✓✓
Introduced at Production
Reporting by ground domain—✓✓
Exception workflow in your systems—✓✓
Approved write-back—✓✓
Monitoring-system integration—✓✓
Introduced at Advanced
Multi-jurisdiction plan rules——✓
Multi-stage ground approvals——✓
High panel count——✓
Multi-panel decision controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, panel count, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your panels, ground domains and plans→Trigger, escalation and review-cycle rule mappingWeek 1
02Representative prior decision records→Reading ingestion, reconciliation and the reconstruction baselineWeek 2
03Your GCMP, TARPs and re-entry protocols→Decision-record mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports→Monitoring and plan-source assessment, then integration setupWeek 2
05Decisions you would not want reconstructed→Re-entry cases and the evaluation suiteWeek 4
06What no ground decision may omit→Confidence scoring, exception routing, guardrails and escalation controlsWeek 3
07Named statutory officials to review the pack→Official review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The widths come from the weeks the work actually occupies, which is the reason that week five overlaps.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Decision workflow discovery, rule mapping and the automation boundaryW2Source integration and the reconstruction baselineW3Reconstruction workflow, confidence logic and review controlsW4Evaluation suite, escalation checks and failure-mode testingW5Monitoring integration, a pilot panel and targeted correctionsW6One review cycle run under the statutory mine manager, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The week 5 overlap is real, not padding.
At the end of W6Validation closes on live panels, and Agent Care picks up monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build the ground decision record before someone hostile asks for it.
Show us your monitoring feeds, your trigger tables and the plan that governs escalation. The next step is one panel and one month: we reconstruct the ground decisions inside it, name what the record cannot answer, and set the automation boundary with you — the officials keep the decisions.