Product-Compliance & Material-Declarations AI Agent
Collect and keep supplier declarations current, screen the bill of materials against the lists in force, chase what is missing, and assemble the pack a named compliance officer signs.
A portfolio compliance figure can read as sound while a few product families carry nearly all of the unsupported claims. Nestack reports the amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Legacy parts with no declaration
8.3%
3.6×
Review
Plated and coated assemblies
6.6%
2.9×
Review
Distributor-sourced components
4.2%
1.8×
Watch
Machined parts, single source
1.3%
0.6×
Normal
Bar: amendment-rate lift vs. machined-part baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Nothing closes until a case exists
A cycle is closed when the unsupported claim is a case the next release must survive. That suite is what the next pack assembled is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Amendment rate rises in a product family.
02Diagnose
The declaration that said none detected and meant not tested is read back to the cause.
03Improve
The change leaves with a version on it and the declarations that found it attached.
04Verify
The release stays shut while any touched declaration case is still red.
05Learn
It is held permanently, and the substance rules shift with it.
Learn → DetectThe return edge. Whatever is detected next meets a longer suite than this one did.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, screening workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Compliance workflow and boundary scoping and boundary definition.
02PLM, ERP and supplier-portal assessment.
03Threshold, list-version and exemption mapping.
04Declaration ingestion and normalisation.
05Screening logic and declaration binding.
06Confidence scoring and gap routing.
07Officer approval workflow.
08PLM and compliance-system integration.
09Substance and declaration cases.
10Guardrails and disclosure controls.
11Part-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne product familyProductionProduction compliance systemsAdvancedMultiple regimes / sites
Introduced at Pilot
Screening to your parts and rules✓✓✓
Officer approval✓✓✓
Declaration-coverage baseline✓✓✓
Introduced at Production
Reporting by product family—✓✓
Approval workflow in your systems—✓✓
Approved write-back—✓✓
Part-master integration—✓✓
Introduced at Advanced
Complex exemption rules——✓
Multi-stage officer approvals——✓
High part volume——✓
Multi-regime substance controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, part volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your part master and bill-of-materials structure→Declaration ingestion and part mappingWeek 1
02Representative supplier declarations→Screening baseline, scope extraction and declaration bindingWeek 2
03Your threshold rules and product-scope decisions→Threshold, list-version and automation-boundary mappingWeek 1
04Access to relevant APIs, feeds or exports→PLM, ERP and supplier-portal assessment, then integration setupWeek 2
05Claims you would not want tested→Disclosure cases and failure-mode testingWeek 4
06What no compliance claim may rest on→Confidence scoring, gap routing, guardrails and approval controlsWeek 3
07Named compliance officers to approve packs→Officer approval workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each phase spans the weeks it actually consumes, so week 5 is doing two jobs at once.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Compliance workflow discovery, threshold mapping and the automation boundaryW2Source integration and the screening baselineW3Screening workflow, confidence logic and approval controlsW4Evaluation suite, scope checks and failure-mode testingW5Compliance-system integration, pilot families and targeted correctionsW6One declaration campaign run under the compliance manager, then Agent Care handover
Reading the bandA bar covers only the weeks its work is named in. The week 5 overlap is work, not padding.
At the end of W6The last checks clear on live packs and Agent Care picks up monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Manufacturing AI agent
Build a product-compliance agent around your declaration file.
Show us your part master, your supplier declarations and who signs. Not a compliance verdict from a model — a gap list, a chased declaration and a pack an officer can sign.