Component Obsolescence, EOL & Counterfeit-Control AI Agent
Watch the parts on your bills of material rather than the notices you were sent, size the last-time-buy exposure behind each one, and hold the disposition for your engineering authority to sign.
A BOM-level exposure figure can read as manageable while a few commodities carry nearly all of the unwatched risk. Nestack reports the amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Parts with no PCN issued
8.8%
3.5×
Review
Sub-tier parts in assemblies
6.1%
2.4×
Review
Suffix and package variants
3.9%
1.6×
Watch
Directly-bought active parts
1.2%
0.5×
Normal
Bar: amendment-rate lift vs. active-part baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
A cycle ends with one more case
A cycle shuts when the silent discontinuation is a case the next release has to catch. That suite is what the next watch list run is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Amendment rate rises in a commodity.
02Diagnose
The part that went end-of-life without a notice anyone received is read back to one cause.
03Improve
The change is numbered on the way out, with the notices that revealed it attached.
04Verify
A disposition case that has not cleared keeps the release parked until it does.
05Learn
It joins the suite for good, and the watch list is edited to match.
Learn → DetectThe return edge. The next watch list runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, watch and sizing, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Programme-workflow and disposition boundary work.
02BOM, part-master and feed assessment.
03Sourcing-tier and screening-criteria mapping work.
04Part-master ingest and notice matching.
05Exposure sizing and evidence binding.
06Confidence scoring and exception routing.
07Authority approval workflow.
08PLM and ERP-system integration.
09Notice and sourcing cases.
10Guardrails and sourcing controls.
11Item-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne programme, one commodityProductionProduction part mastersAdvancedMultiple programmes / sites
Introduced at Pilot
Watching to your BOMs and rules✓✓✓
Authority approval✓✓✓
Watch-coverage baseline✓✓✓
Introduced at Production
Reporting by commodity—✓✓
Approval workflow in your systems—✓✓
Approved write-back—✓✓
BOM and distributor integration—✓✓
Introduced at Advanced
Multi-standard sourcing rules——✓
Multi-stage engineering approvals——✓
High part-count BOMs——✓
Multi-programme sourcing controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your bills of material and part master→Part-master ingestion and notice matchingWeek 1
02Representative notices and BOM revisions→Watch baseline, notice matching and BOM bindingWeek 2
03Your sourcing tiers and approved suppliers→Sourcing-tier and screening-rule mappingWeek 1
04Access to relevant APIs, feeds or exports→BOM, part-master and feed assessment, then integration setupWeek 2
05Parts you would not want bought→Counterfeit cases and the evaluation suiteWeek 4
06What no source may be trusted on→Confidence scoring, exception routing, guardrails and sourcing controlsWeek 3
07A named engineering authority to approve→Authority approval workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Bands sit where the notices put them, which is why week 5 holds evaluation and pilot at once.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Obsolescence workflow discovery, rule mapping and the automation boundaryW2Source integration and the watch-list baselineW3Exposure sizing, confidence logic and approval controlsW4Evaluation suite, sourcing and screening checks and failure-mode testingW5PLM and ERP integration, pilot parts and targeted correctionsW6One programme review run under the component engineer, then Agent Care handover
Reading the bandEach bar covers only the weeks its work is named in. The week 5 overlap is work, not padding.
At the end of W6Once the review validates, Agent Care owns the running agent.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Manufacturing AI agent
Build an obsolescence agent around your engineering-authority disposition.
Show us your BOMs and who signs a disposition. What you get, plainly: a watch list against your own parts, the exposure sized with its evidence, and a pack your authority can approve.