Assemble each disclosure figure with the source record and method behind it, apply the framework mapping you have configured, and hold the workpaper for the named preparer, who decides what is published.
Ingesting meter data, fuel and invoice records and factor sets from supported energy, ERP or data-platform sources.
02
Normalising units, periods and site names, and carrying each datapoint forward with the record it came from.
Reason
03
Assembling the workpaper behind each figure — source record, method, factor version and period.
04
Applying the framework mapping, boundary and consolidation approach the organisation has configured.
05
Reconciling each total against the prior period and writing the movement against the datapoints that moved it.
Decide
06
Marking a market-based figure with the instruments it rests on and whether they have been retired.
07
Routing the assembled figure and its narrative to the named preparer for acceptance.
Out
08
Retaining the datapoint, the method, the preparer's amendments and the acceptance in the workpaper.
09
Executing write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent assembles the basis; the named preparer decides what is signed, and the organisation stays the reporting entity.
Example workflow
One figure, meter read to sign-off
AgentHuman
1Datapoint receivedMeter record, fuel or invoice line, factor set or an ERP extract
2Basis assembledSource record, period, boundary, method and factor version, each named
3Figure proposedFigure, movement, dual basis and confidence
4Controls appliedTraceability checks, the configured mapping rules, instrument checks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is filed or published at any of them — the agent is assembling evidence, and the preparer's lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the named preparer to accept.
Low confidence
Adds a data-owner check first.
Preparer sign-off
The figure is held with its source record, its method and the confidence.
Accept · Amend · Send to data owner
Accepted — released to report▼
6Reporting systems updatedOnly where write access and approval policy allow it
7Outcome evaluatedAmendment rate, restatements, evidence gaps and findings raised on review
Amendments
Every preparer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Publishing or filing a disclosure of any kind.
Signing off a figure or a restated prior total.
Making an environmental marketing claim of any kind.
Deciding that a framework applies to the entity.
Automation boundaryAgent acts unaided
✓Collect each datapoint with its source record and method.
✓Apply the framework mapping the organisation has configured.
✓Reconcile against the prior period and explain the movement.
✓Hold the assembled workpaper for the named preparer.
Any write happens inside the boundaries agreed at implementation, never ahead of sign-off.
Changing a method, a boundary or an emissions factor.
Retiring or allocating a market-based instrument.
Stating a carbon-neutral or offset-based position.
Changes to mapping, thresholds or approval rules.
Example output
One figure in the workpaper, annotated
Everything the agent proposes is attached to the record it was drawn from.
Disclosure output · single datapointIllustrative example
Site
Datapoint
Value
Source of record
Confidence
Method
Northern network depot
Purchased electricity for the reporting period
412,600 kWh
Meter register on file
93%
Location and market basis
As receivedTaken from the meter register and the supplier invoice — nothing on this side is written by the agent.
Evidence usedMeter register readSupplier invoiceFactor set version
Why this methodIt is the method configured for this boundary — not chosen per datapoint.
ActionAcceptAmendSend to data owner
What the score decidesBelow the configured threshold the figure picks up a data-owner check before it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every datapointFrom the source record
03Assembly
Build from the record
Draw on the meter, invoice and factor records and the mapping the organisation has configured.
01Approved path
Every figure keeps its source
Routine datapoints arrive already assembled with their basis attached.
02Human review
Send review to the thin evidence
Evidence gaps, unretired instruments and low-confidence figures are marked, so the preparer's read starts where the basis is weakest.
04Build an evidence trail
The datapoint, the method applied to it and the preparer who accepted it stay in the workpaper.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Energy and emissions dataMeter data · SCADA historians Fuel, fleet and invoice records
Sustainability platformsWatershed · Persefoni Sphera · Net Zero Cloud
Scope 3 value-chain estimates absorb most of the amendments, and a clean overall figure will not show you that. Nestack reports the preparer-amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Scope 3 value-chain estimates
6.1%
3.7×
Review
Market-based instrument claims
4.3%
2.6×
Review
Newly acquired or divested sites
3.3%
2.0×
Watch
Metered Scope 1 and 2 data
1.3%
0.8×
Normal
Bar: preparer-amendment-rate lift vs. metered Scope 1 and 2 baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
The loop closes on a test, not a note
The cycle does not end in a post-mortem. It ends in a case the next release must clear, and that suite is what the next disclosure is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Preparer-amendment rate rises in a disclosure area.
02Diagnose
Which datapoints moved, and under which method? The workpapers are read back until the cause narrows to one.
03Improve
Each change carries a version and the disclosures that forced it.
04Verify
Release waits on the affected cases going green again.
05Learn
The case is kept for good, and the method notes are rewritten.
Learn → DetectThe return edge. The next detection runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, assembly workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Disclosure workflow discovery and automation-boundary definition.
02Meter, ERP and data-platform assessment.
03Framework mapping, boundary and consolidation approach.
04Datapoint ingestion and normalisation.
05Workpaper assembly and source binding.
06Confidence scoring and gap routing.
07Preparer sign-off workflow.
08Data-platform and reporting integration.
09Audit-evidence regression cases.
10Guardrails and claim controls.
11Workpaper-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne reporting entity, one periodProductionProduction data platformsAdvancedMultiple entities / mappings
Introduced at Pilot
Assembly to your records and mapping✓✓✓
Preparer sign-off✓✓✓
Evidence-quality baseline✓✓✓
Introduced at Production
Reporting by disclosure area—✓✓
Preparer review in your systems—✓✓
Approved write-back—✓✓
Data-platform integration—✓✓
Introduced at Advanced
Multi-framework mapping rules——✓
Multi-stage disclosure approvals——✓
High datapoint volume——✓
Multi-framework disclosure controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your reporting boundary and entity structure→Datapoint ingestion and source-record mappingWeek 1
02Representative prior-period disclosures→Assembly baseline, method extraction and source bindingWeek 2
03Your framework mapping and its named owner→Framework mapping, boundary and consolidation approachWeek 1
04Access to relevant APIs, feeds or exports→Meter, ERP and data-platform assessment, then integration setupWeek 2
05Claims you would not want published→Evidence cases and failure-mode testingWeek 4
06What a draft may never assert on its own→Confidence scoring, gap routing, guardrails and claim controlsWeek 3
07Named preparers to accept figures→Preparer sign-off workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands sit on the weeks the work occupies, which is why the fifth carries two kinds at once.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Disclosure workflow discovery, mapping and the automation boundaryW2Source integration and the assembly baselineW3Assembly workflow, confidence logic and sign-off controlsW4Evaluation suite, claim checks and failure-mode testingW5Reporting-system integration, pilot areas and targeted correctionsW6One disclosure cycle drafted under the reporting team, then handover
Reading the bandA band covers the weeks its work is named in, and nothing else. The week 5 overlap is real, not padding.
At the end of W6The cycle closes the validation and Agent Care takes over monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Energy AI agent
Build a sustainability agent around your workpaper, not around your report template.
Show us your datapoints, the records behind them and the mapping you report against. The preparer named in your reporting policy is the one who signs, and we will name what never leaves their desk.