Carry one file per model per market — the certificate, the representative named on it, the standards edition behind it — and raise the renewal while a named person still has time to file.
A certificate nears expiry, and the clock runs from the date the authority issued it, not the day anyone noticed.
02
A UK statement of compliance carries the signature, name and function of the signatory, per Sch. 4(f).
Reason
03
A BIS CRS certificate runs late in India, and past the 90-day mark the renewal becomes a fresh application instead.
04
A UAE dealer registration and a TDRA type approval run separate clocks, and the dealer one gates the submission.
05
A Saudi CST term is read from test-house guidance, and those sources give twelve months and two years both.
Decide
06
A module is swapped, and every market that granted on the old configuration goes back in front of a named person.
07
A representative named on a certificate leaves, and an approval held in another name is suddenly nobody's approval.
Out
08
A record is kept whole — the certificate, the mandate behind it, the renewal filed and the person who signed it.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent assembles the file and runs the clocks; a named regulatory affairs person, or the in-country representative, signs and files, and the manufacturer answers for the market.
Example workflow
One model, one market, certificate to filing
AgentHuman
1Certificate on fileRegulator database, test-house certificate, representative mandate or a renewal notice
2Market file assembledThe issuing body, the representative named on it, the standards edition and the configuration the approval assumed
3Clocks setExpiry, the renewal window and the lead time the authority actually takes
4Controls appliedClock checks, mandate checks, standards-edition checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is filed at any of them — the agent is assembling, and the regulatory affairs lane opens at the completeness gate.
5DecisionBranches at the completeness gate
Pack complete
Goes to the regulatory affairs lead to file.
Anything thin
Adds an in-country representative read first.
Regulatory affairs review
The pack is held with its clocks, its certificate history and its gaps.
File the renewal · Append evidence · Send to the representative
Filed — by a named person▼
6Certificate register updatedOnly where write access and disclosure policy allow it
7Outcome evaluatedClock margin, pack completeness, representative corrections and what a later audit found
Corrections
Each representative correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Signing or filing an application for type approval.
Acting as the in-country representative of record.
Declaring a product unchanged since its approval.
Deciding that a market is open to a model.
Automation boundaryAgent acts unaided
✓Build one file per model per market from your own certificate records.
✓Run each expiry clock from the date on the certificate.
✓Flag the module or BOM change the approval never assumed.
✓Draft the renewal pack against what the authority asks.
No filing reaches an authority except by a named signatory, inside the boundary.
Judging that a representative mandate is still live.
Reading silence from a regulator as permission.
Choosing a certification body or a test laboratory.
Changes to renewal rules, clocks or pack templates.
Example output
One market file, annotated
The OPSS enforcement reports read to 31 March 2026 name actions under other regimes and none under PSTI.
Market file · single modelIllustrative example
Market
Held as
Clock
Certificate of record
Confidence
Held for
Brazil, Category II radio module
Homologation active, certificate of conformity attached
Day 61 to expiry
OCD certificate, 12 February 2026
Held unfiled
The regulatory affairs lead, in person
As receivedTaken from the issued certificate and the mandate on file — nothing here is granted or renewed by the agent.
What the file holdsThe issued certificateRepresentative mandateStandards edition
Why no filing hereOnly a Brazilian legal entity with a CNPJ may hold the homologation.
ActionFile the renewalAppend evidenceSend to the representative
What the score decidesBelow the configured threshold the pack picks up a representative read before.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every marketFrom the certificate register
03Evidence
Approvals that expire
US equipment authorization belongs to our FCC agent, conformity documents to our retail one, vehicles to automotive; these approvals expire in another name.
01Approved path
The certificate has a clock
ANATEL renews a Category I certificate yearly and a Category II every two, on test-house sourcing, and the homologation ID lapses with it.
02Human review
The function, not only the name
SI 2023/1007 brought PSTI into force on 29 April 2024, and the statement is kept for the longer of ten years from issue or the defined support period.
04Build an evidence trail
The certificate, the representative named on it and the renewal filed stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Regulators and bodiesANATEL · BIS · TDRA · CST ISED · ACMA · SRRC portals
Certificate registerType-approval certificates In-country representative records
Product and change recordsPLM · BOM and module revisions Test reports · standards editions
Agent
Type approval & market access
Reads the certificate Runs the clocks Holds for the filer
Planning and releaseLaunch plans · ship-to markets Test-house engagements
A market-level certificate-currency rate can read clean while one market absorbs most of the corrections. Nestack reports the representative-correction rate by market, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Fixed-term certificate markets
8.9%
3.6×
Review
Markets held by a representative
6.3%
2.6×
Review
Indefinite-while-unchanged markets
3.9%
1.6×
Watch
Long-standing single-model markets
2.1%
0.9×
Normal
Bar: representative-correction-rate lift vs. long-standing single-model baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What a lapsed certificate costs
A cycle is done when the lapsed renewal has become a case the next release must pass. That suite is what the next market opened is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Representative-correction rate rises in one market.
02Diagnose
The market that closed on a renewal filed four days late is read back until one cause remains.
03Improve
Number the change; the markets that drove it are filed under it.
04Verify
Each touched market case is run once more, and one red holds it back.
05Learn
It stays as a standing test, and the renewal rules move with it.
Learn → DetectThe return edge. The next market is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, file assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Market-access workflow discovery and boundary work.
02Regulator, PLM and certificate sources.
03Renewal-term, clock and representative-mandate map.
04Certificate ingestion and normalisation.
05Standards-edition and module binding.
06Completeness scoring and pack routing.
07Filer submission workflow.
08Certificate-register integration.
09Renewal and validity cases.
10Guardrails and submission controls.
11Certificate-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne product line, one marketProductionProduction certificate registerAdvancedMultiple lines / markets
Introduced at Pilot
File assembly to your rules✓✓✓
Named-filer submission✓✓✓
Certificate-inventory baseline✓✓✓
Introduced at Production
Reporting by market—✓✓
Filing workflow in your systems—✓✓
Approved write-back—✓✓
Regulatory-database integration—✓✓
Introduced at Advanced
Multi-authority renewal duties——✓
Cross-market evidence packs——✓
High certificate volume——✓
Multi-market renewal controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your certificate register and markets→Certificate ingestion and market mappingWeek 1
02Representative certificates and mandates→File baseline, clock binding and mandate captureWeek 2
03Your renewal rules and filing routes→Renewal-term, clock and mandate mapping and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Regulator, PLM and register assessment, then integration setupWeek 2
05Certificates you would not want lapsed→Renewal cases and failure testingWeek 4
06What no approval record may promise→Completeness scoring, pack routing, guardrails and filing controlsWeek 3
07A named regulatory affairs lead to file→Filer submission workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band is the honest working time for its phase, and the fifth one is shared because the work is.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Market-access discovery, renewal mapping and the automation boundaryW2Source integration and the certificate baselineW3File assembly, clock logic and filing controlsW4Evaluation suite, renewal cases and failure-mode testingW5Register integration, pilot markets and targeted correctionsW6One renewal cycle run under the regulatory affairs lead, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The doubled fifth week is real work, not padding.
At the end of W6When the certificate register validates, Agent Care takes the agent on.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build a type-approval agent around the certificates that expire.
Every market on this page keeps its own clock and its own signatory. Show us your certificate register and the mandates behind it, and we will name which approval runs out first and which one is held in a name that is not yours.