Chase the declaration down the tiers it has to cross — the smelter behind each part, who answered and who went quiet — and leave the Form SD to the officer who signs it.
A supplier answers for its own tier and goes quiet on the one below, and the chase carries on down.
02
A template returns, and it is reconciled against the bill of materials it was meant to cover, part by part.
Reason
03
A smelter is named, and it is checked against the conformant-smelter list, not against the supplier naming it.
04
A filing date approaches, and it is re-derived from the calendar year, not from the fiscal year.
05
A deadline falls on a Sunday, and Exchange Act Rule 0-3(a) moved it to Monday 1 June in 2026.
Decide
06
A product is described as DRC conflict free, and that one sentence is what puts an audit back in scope.
07
An Annex I volume threshold is crossed, and Regulation (EU) 2017/821 reaches worldwide, not the DRC.
Out
08
A record is kept whole — the responses, their dates, the non-responders and the officer who signed.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent chases the responses and keeps the inquiry record; a named executive officer signs the Form SD on behalf of the registrant, and the issuer answers for it.
Example workflow
One part, template to signature
AgentHuman
1Declaration requestedA CMRT or EMRT issued to the direct supplier of record
2Smelter list assembledSmelter and refiner names, the tier reached, response dates and the parts each answer covers
3Inquiry record builtCountry-of-origin reasoning per part, against the limbs Item 1.01 sets out
4Controls appliedCoverage checks, response-date checks, conformant-list checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is determined at any of them — the agent is chasing, and the counsel lane opens at the completeness gate.
5DecisionBranches at the completeness gate
Coverage sufficient
Goes to the supply chain counsel to release.
Anything thin
Adds a securities counsel read first.
Supply chain counsel review
The record is held with its responses, its coverage and its gaps.
Release the record · Append evidence · Send to counsel
Released — signed by a named officer▼
6Supplier and part records updatedOnly where write access and disclosure policy allow it
7Outcome evaluatedCoverage margin, response completeness, counsel corrections and what a later review found
Corrections
Each counsel correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Determining where a mineral originated.
Concluding the country-of-origin inquiry.
Signing or filing the Form SD.
Calling any product DRC conflict free.
Automation boundaryAgent acts unaided
✓Chase the template down each tier and log who answered.
✓Reconcile each response against the bill of materials it covers.
✓Check each named smelter against the conformant-smelter list.
✓Hold the reasoning per part with the person who made it.
Nothing is filed except by a named executive officer, inside the agreed boundaries.
Judging a supplier response adequate.
Deciding an audit is or is not required.
Writing or approving the website disclosure.
Changes to templates, tiers or chase rules.
Example output
One part, annotated
Form SD is filed and not furnished, so Section 18 liability attaches and the record is read back years later.
Inquiry record · single partIllustrative example
Part
Chased as
Tier reached
Response of record
Confidence
Held for
Tantalum capacitor, power rail
CMRT reissued, smelter names incomplete
Third tier of four
Supplier return, 14 April 2026
Held unfiled
The supply chain counsel, in person
As receivedTaken from the supplier return and the bill of materials — the chase reaches as far as a tier will answer.
What the record holdsThe returned templateSmelter and refiner listNon-responder log
Why no inquiry call hereItem 1.01(a) asks for a reasonable inquiry, and the officer runs it.
ActionRelease the recordAppend evidenceSend to counsel
What the score decidesBelow the configured threshold the record picks up a counsel read before.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every partFrom the bill of materials
03Evidence
Below the distribution path
Our procurement agent names the distribution path behind a candidate part; this one goes on down to the smelter under it.
01Approved path
Smelters, not suppliers
The control point under 17 CFR 240.13p-1 and under Regulation (EU) 2017/821 is the smelter or refiner, never the supplier that invoiced you.
02Human review
Where the certification lands
Our mining agent closes on the certification sitting downstream. Downstream is the manufacturer who files, and that is this page.
04Build an evidence trail
The part, the smelter list behind it and the officer who signed the filing stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Declaration templatesCMRT · EMRT returns Conformant-smelter list
Supplier recordsSupplier master · contacts Response and chase history
Product and part recordsPLM · bill of materials Part master · AVL
Agent
Conflict minerals inquiry
Reads the template Chases the tier Holds for the officer
Filing and disclosureForm SD workpapers Website disclosure posting
A product-level smelter-coverage figure can read clean while one product group absorbs most of the corrections. Nestack reports the counsel-correction rate by product group, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Tungsten vibration-motor parts
6.2%
3.6×
Review
Tantalum capacitor assemblies
4.4%
2.6×
Review
Gold-plated connector parts
2.9%
1.7×
Watch
Tin solder on board assemblies
1.6%
0.9×
Normal
Bar: counsel-correction-rate lift vs. tin-solder board-assembly baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
What an unreconstructable record costs
A cycle ends when the unanswered tier-three supplier is a standing case. That suite is what the next inquiry run is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Counsel-correction rate rises in one product group.
02Diagnose
The declaration that answered for one tier and went silent on the one below is read back until one cause remains.
03Improve
Every change leaves numbered, with the parts that caused it filed beneath.
04Verify
A single red part case is enough to keep the release back.
05Learn
The case is permanent, and the inquiry rules are rewritten with it.
Learn → DetectThe return edge. The next inquiry is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, record assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Inquiry-workflow discovery and boundary definition.
02Supplier, PLM and template sources.
03Smelter-list, tier-depth and chase-rule mapping.
04Template ingestion and normalisation.
05Bill-of-materials and smelter binding.
06Completeness scoring and counsel routing.
07Officer release workflow.
08Supplier and PLM integration.
09Smelter and response cases.
10Guardrails and inquiry controls.
11Inquiry-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne product group, one templateProductionProduction inquiry workflowAdvancedMultiple groups / regimes
Introduced at Pilot
Record assembly to your rules✓✓✓
Named-officer release✓✓✓
Smelter-list baseline✓✓✓
Introduced at Production
Reporting by product—✓✓
Release workflow in your systems—✓✓
Approved write-back—✓✓
Bill-of-materials integration—✓✓
Introduced at Advanced
Multi-regime inquiry duties——✓
Cross-tier chase packs——✓
High part volume——✓
Multi-tier chase controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your bill of materials and supplier master→Part ingestion and supplier mappingWeek 1
02Representative returned templates→Record baseline, tier binding and response captureWeek 2
03Your chase rules and filing calendar→Smelter-list, tier-depth and chase-rule mapping and the automation boundaryWeek 1
04Access to relevant APIs, feeds or exports→Supplier, PLM and template assessment, then integration setupWeek 2
05Inquiries you would not want re-run→Response cases and the evaluation suiteWeek 4
06What no country-of-origin inquiry may conclude→Completeness scoring, counsel routing, guardrails and release controlsWeek 3
07A named executive officer to sign→Officer release workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The widths are the weeks the work actually takes, and the fifth week is shared for that reason.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Inquiry workflow discovery, chase mapping and the automation boundaryW2Source integration and the smelter-list baselineW3Record assembly, chase logic and release controlsW4Evaluation suite, response cases and failure-mode testingW5Supplier integration, pilot parts and targeted correctionsW6One filing year run under the supply chain counsel, then Agent Care handover
Reading the bandA bar covers only the weeks its own work is named in. The doubled fifth week is real work, not padding.
At the end of W6When the inquiry record validates, Agent Care takes the agent on.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build a conflict minerals agent around the officer who has to sign.
Show us how a declaration reaches you today and who signs before 31 May 2027. Form SD is filed and not furnished, so it has to survive being read as a statement the issuer made, by a reviewer looking years later for what the inquiry rested on.