An RFI answer with design content is design, and design is a licensed act. The agent logs, routes and chases — the responder in responsible charge answers and signs.
Log every inbound RFI against the drawing, specification and location it cites.
02
Log a repeat against the original thread rather than opening a second one.
Reason
03
Route each RFI to the named responder the project responsibility matrix sets.
04
Route anything carrying design content to the professional in responsible charge.
05
Report ageing, response-time breaches and the RFIs sitting on open delay events.
Decide
06
Report every out-of-date file in circulation against the register the CDE holds.
07
Route the drafted wording to the responder, who decides what is released.
Out
08
Log the question, its routing, every status change and the responder's decision.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent logs and routes; the responder in responsible charge answers — and once the field has built to an answer, the remedy is physical work, not an edit.
Example workflow
One RFI, inbox to response
AgentHuman
1RFI receivedContractor query, site question, submittal comment or coordination issue
2Register entry madeThe drawing, specification, location and revision cited, with the status the CDE holds for each
3Routing computedNamed responder, discipline, ageing clock, design-content flag and confidence
4Controls appliedResponsibility-matrix checks, design-content and scope tripwires, ageing clocks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is answered or published at any of them — the agent is logging and routing, and the responder's lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the named responder.
Low confidence
Adds a contracts read first.
Responder review
The RFI is held with the documents it cites, its flags and the confidence.
Answer · Reassign · Send to contracts
Answered — released by the responder▼
6Register and CDE updatedOnly where write access and approval policy allow it
7Outcome evaluatedResponse time, reassignments, design-content catches and answers disputed afterwards
Reassignments
Every reassignment made in review is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Answering an RFI with design content.
Changing an information container's status code.
Issuing or distributing a drawing for construction.
Closing, voiding or merging an RFI.
Automation boundaryAgent acts unaided
✓Log, deduplicate and index inbound RFIs against drawings, specs and locations.
✓Route to the named responder and chase on the agreed clock.
✓Report ageing and response-time breaches.
✓Reconcile the register and flag stale files.
Any write happens inside the boundaries agreed at implementation, and never onto a status code.
Declaring a response a variation, a change, or no change.
Asserting that deemed acceptance has occurred.
Writing to or amending golden-thread records.
Deleting or suppressing a superseded revision or comment.
Example output
One RFI, annotated
Everything the agent logs is attached to the documents the question cites.
Register entry · single RFIIllustrative example
Package
Question
Open for
Routing
Confidence
Status held
Façade subcontract
Bracket fixing at the slab edge is not shown for this bay
6 days
Design content — engineer of record
95%
Shared, per the project BEP
As receivedTaken from the register and the CDE as it currently stands — nothing on this side is written by the agent.
What was readCited drawing revisionSpecification sectionResponsibility matrix
Why this routingAn answer here would carry a dimension, so it goes to the licensee in responsible charge.
ActionAnswerReassignSend to contracts
What the score decidesBelow the configured threshold the RFI picks up a contracts read before the responder sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every inbound RFIFrom the CDE and the register
03Routing
Apply the project's own protocol
Status codes and responder duties come from the project's BEP and information protocol, which is what governs here.
01Approved path
Route it to the right desk
Routine logging, deduplication and chasing happen before anyone opens the register.
02Human review
Send review to the design questions
Design-content and scope-change flags are marked, so the responder's read starts where licensure sits.
04Build an evidence trail
The question, its routing and every status change stay on the register.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
CDE and document controlAconex · Autodesk ACC Procore · Newforma
RFI workflowProcore · Newforma Trimble Viewpoint For Projects
Model authoring and coordinationAutodesk Revit · Navisworks Solibri · Revizto
Agent
RFI & document control
Reads the register Routes the question Holds for the responder
Markup and handoverBluebeam Revu · Dalux ISO 19650 codes · project BEP
Aggregate response quality can look acceptable while a few packages carry nearly all of the releases that never reached a licensed responder. Nestack reports the rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Delegated-design packages
3.2%
3.6×
Review
Higher-risk buildings
2.5%
2.8×
Review
Traditional design-bid-build
1.6%
1.8×
Watch
Repeat-typology work
0.8%
0.9×
Normal
Bar: unsigned-release-rate lift vs. an all-response baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
A cycle closes on a test, not an answer
Closing means the failure is now a case the next release is measured against, not that someone has written up what happened.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Unsigned-release rate rises in a package slice.
02Diagnose
Which step let it out — the routing, the tripwire, the register or the queue?
03Improve
A version stamp and the RFI thread travel with the correction.
04Verify
Release is held until the affected register cases clear.
05Learn
Both the suite and the responsibility matrix carry it from then on.
Learn → DetectThe return edge. The next detection runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, RFI workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01RFI workflow discovery and boundary definition.
02CDE, RFI and model source assessment.
03Responsibility-matrix and status-code mapping.
04RFI ingestion, deduplication and indexing.
05Routing logic and design-content tripwires.
06Confidence scoring and RFI routing.
07Responder review workflow.
08CDE and project-system integration.
09Response-quality regression cases.
10Guardrails and release controls.
11Register and status instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne project, one CDEProductionProduction CDE and RFI systemsAdvancedMultiple projects / CDEs
Introduced at Pilot
Logging and routing on your matrix✓✓✓
Responder review✓✓✓
Response-quality baseline✓✓✓
Introduced at Production
Reporting by package—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Analytics feed for design teams—✓✓
Introduced at Advanced
Multi-project CDE rules——✓
Multi-stage responder review——✓
High RFI volume——✓
Enterprise CDE controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, RFI volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your responsibility matrix and named responders→Routing rules and responder mappingWeek 1
02Representative RFIs and their responses→Routing baseline, deduplication and design-content tripwiresWeek 2
03Your BEP and information protocol→Status-code mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports→CDE, RFI and model system assessment, then integration setupWeek 2
05RFIs that turned out to be design questions→Response-quality cases and failure-mode testingWeek 4
06Which responses may never leave without a licensed read→Confidence scoring, RFI routing, guardrails and approval controlsWeek 3
07Named responders to review the routing→Responder review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each phase sits on the weeks it really occupies. Week 5 runs evaluation and pilot at the same time.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1RFI workflow discovery, protocol mapping and the automation boundaryW2Source integration and the routing baselineW3Tripwires, confidence logic and review controlsW4Evaluation suite, guardrails and failure-mode testingW5CDE integration, pilot packages and targeted correctionsW6A live RFI cycle answered under the responder, then handover
Reading the bandEach bar covers the weeks its work is named in and no others. The week 5 overlap is real, not padding.
At the end of W6Sign-off on the pilot register, then continuous monitoring under Agent Care.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Construction AI agent
Build an RFI agent around your responsibility matrix.
Show us your CDE, your matrix and who sits in responsible charge. If your RFIs carry design content, the licensee answers and seals — we map what the agent hands them, and what it never touches.