A time bar usually bars: a notice missed by a day loses the entitlement on merits nobody reaches. Where a court may now relieve one, the evidence decides, and the agent keeps it.
Computes the deadline; it does not serve the notice
In
01
Compute the notice-deadline register from the clocks and triggers your executed contract sets.
02
Diff each programme revision against the last — activity, duration, tie and calendar.
Reason
03
Archive every revision immutably, with its author, timestamp, data date and provenance.
04
Compute time elapsed on each open item and escalate long before the window closes.
05
Diff field progress against the model and flag as-built dates no record supports.
Decide
06
Diff the model against the accepted programme and flag drift instead of closing it.
07
Route every register item and every draft to the planner who holds it.
Out
08
Archive the records read, the draft, the amendments and the decision against the event.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent computes deadlines and drafts; the contracts administrator serves the notice — and a date that has passed cannot be un-passed by anyone.
Example workflow
One delay event, record to draft
AgentHuman
1Delay event recordedSite diary, progress update, instruction or correspondence
2Clocks resolvedThe notice periods, triggers and escalation steps configured from the contract as executed
3Register item computedDeadline, time elapsed and confidence
4Controls appliedConfigured-clock checks, evidence checks, escalation timers and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is served at any of them — the agent is computing deadlines, and the planner's lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the planner who holds it.
Low confidence
Adds a contracts read first.
Planner review
The item is held with its deadline, the records behind it and the confidence.
Acknowledge · Amend draft · Send to contracts
Acknowledged — back with contracts▼
6Schedule systems updatedOnly where write access and approval policy allow it
7Outcome evaluatedEscalation lead time, drafts amended, notices served and events that ran past the window
Amendments
Every amendment made in review is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Serving or transmitting any contractual notice.
Approving, rejecting or accepting a programme submission.
Changing the baseline, data date, calendars or logic.
Selecting the delay-analysis method.
Automation boundaryAgent acts unaided
✓Compute the notice-deadline register with escalation timers for each named owner.
✓Diff two programme revisions, activity by activity.
✓Reconcile field progress against the model.
✓Archive every revision with its author, timestamp and provenance.
Any write happens inside the boundaries agreed at implementation, and never into the live programme.
Characterising delay as excusable, compensable or concurrent.
Certifying, waiving or forecasting liquidated damages.
Declaring time at large, or a claim time-barred.
Releasing a schedule or forecast outside the project.
Example output
One register item, annotated
Everything the agent computes is attached to the records it was read from.
Register item · single delay eventIllustrative example
Package
Delay event
Window elapsed
Item state
Confidence
Clock source
Piling subcontract
Access to the piling zone withheld by the principal
52% elapsed
Escalated — draft with the planner
93%
The contract as executed
As receivedTaken from the site records and the clocks configured for this contract — nothing on this side is written by the agent.
What was readSite diary entryAccepted programme revisionCorrespondence log
Why this deadlineThe period comes from the contract as executed and amended.
ActionAcknowledgeAmend draftSend to contracts
What the score decidesBelow the configured threshold the item picks up a contracts read before the planner sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every delay eventFrom records and the contract
03Deadline
Apply the contract as executed
Standard forms are almost always amended, so the agent works from the clocks configured for your contract, not the printed form.
01Approved path
See the bar before it closes
Routine register items and revision diffs arrive already computed.
02Human review
Send review to the tight clocks
Short windows and low-confidence items are marked, so the planner's read starts where the clock is tightest.
04Build an evidence trail
Every revision keeps its author, its timestamp and the diff that produced it.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
CPM scheduling enginesOracle Primavera P6 · Asta Powerproject Microsoft Project · Deltek Open Plan
The all-event baseline is the number a monthly report shows; underneath it a small set of contract cohorts absorbs most of the late escalations. Nestack reports the rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
FIDIC and NEC EPC packages
5.9%
3.7×
Review
AS 4000 head contracts
4.0%
2.5×
Review
JCT and A201 traditional build
2.4%
1.5×
Watch
Framework programmes
0.8%
0.5×
Normal
Bar: late-escalation-rate lift vs. an all-event baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Nothing closes until the suite grows
The loop shuts when the miss is a case in the suite, not when someone has explained it.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Late-escalation rate rises in a contract-form slice.
02Diagnose
Not isolated until the archive, the records and the register agree on one cause.
03Improve
Whatever changes ships against a version, with the notices that prompted it attached.
04Verify
Nothing ships until the affected cases pass a second time.
05Learn
The suite grows by one case; so does the notice playbook.
Learn → DetectThe return edge. Detection next time runs against a longer suite.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, notice workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Programme workflow discovery and boundary work.
02Schedule and field-record assessment.
03Contract-clock, calendar, float and notice-rule mapping.
04Programme ingestion and normalisation.
05Deadline computation and revision-diff logic.
06Confidence scoring and register-item routing.
07Planner review workflow.
08Scheduling and document-system integration.
09Notice-timing regression cases.
10Guardrails and service controls.
11Revision-archive instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne project, one contract formProductionProduction scheduling systemsAdvancedMultiple projects / forms
Introduced at Pilot
Deadlines from your executed contract✓✓✓
Planner review✓✓✓
Notice-timing baseline✓✓✓
Introduced at Production
Reporting by contract form—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Client and funder reporting feed—✓✓
Introduced at Advanced
Multi-form portfolios——✓
Multi-stage contract review——✓
High event volume——✓
Enterprise programme controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, event volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your contract forms and their executed amendments→Contract-clock and trigger mappingWeek 1
02Representative programme revisions→Deadline baseline, revision diffing and progress reconciliationWeek 2
03Your notice register and escalation practice→Escalation-timer mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports→Scheduling, field and document assessment, then integration setupWeek 2
05Delay events you did not notice in time→Notice-timing cases and the evaluation suiteWeek 4
06Where a draft notice stops and waits for the planner→Confidence scoring, item routing, guardrails and approval controlsWeek 3
07Named planners to review the register→Planner review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each phase is drawn across the weeks it truly occupies. Week 5 carries evaluation and pilot at once.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Programme workflow discovery, clock mapping and the automation boundaryW2Source integration and the deadline baselineW3Diff logic, confidence scoring and review controlsW4Evaluation suite, guardrails and failure-mode testingW5Scheduling-system integration, pilot events and targeted correctionsW6A full monthly programme cycle under the planner, then handover
Reading the bandEach bar covers the weeks its work is named in and no others. The week 5 overlap is real, not padding.
At the end of W6Once the cycle validates, Agent Care owns the running agent.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Construction AI agent
Build a project-schedule agent around your notice clocks.
Show us your contracts as executed, your programme revisions and who serves the notice. Once a window closes the entitlement closes with it, so we map the clocks first and name what the agent never touches.