A major change carried out before it is granted cannot be regularised, and on a higher-risk building in England the approval shields nothing. The agent assembles the record; the client signs it.
Drafts the record behind a change, not the answer to a question
In
01
A design moves, and the agent opens a change record against the agreed documents the project holds.
02
A change meets reg 26, and the agent drafts recordable, notifiable or major with the limb it relied on.
Reason
03
An adviser is consulted, and the agent records the name, the occupation and a summary of the advice.
04
A document is affected, and the agent lists it and checks the revised version exists before work starts.
05
A compliance position is needed, and the agent drafts it for the person in responsible charge to settle.
Decide
06
A notifiable change is drafted, and the agent holds the reg 20 notice unsent until the client signs it.
07
A major change is drafted, and the agent stages the reg 21 application; reg 18 bars the work until granted.
Out
08
A change closes, and the entry, the advice, the revisions and the signature stay against the project.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent drafts and the client signs — and once a major change is carried out, no regularisation application may be made, so the work sits outside the approval.
Example workflow
One change, proposal to record
AgentHuman
1Change proposedSite instruction, design revision, product substitution or dutyholder change
2Documents assembledThe agreed documents, the drawings they govern and the golden-thread revision each one sits at
3Category draftedRecordable, notifiable or major, the reg 26 limb relied on and confidence
4Controls appliedReg 19 element checks, consultation-record checks, document-impact checks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is classified, notified or signed at any of them — the agent is drafting, and the client's lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the named client.
Low confidence
Adds a principal designer read first.
Client decision
The change is held with its draft category, its consultation record and the confidence.
Adopt · Recategorise · Send to principal designer
Adopted — signed and released▼
6Log and golden thread updatedOnly where write access and approval policy allow it
7Outcome evaluatedRecategorisations, missing elements, information requests and changes reworked at completion
Recategorisations
Every recategorisation made in review is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Deciding the category a change falls into.
Signing the change record, notice or application.
Stating that the changed work complies.
Starting work before a major change is granted.
Automation boundaryAgent acts unaided
✓Propose the category against reg 26 and cite the limb relied on.
✓Assemble the reg 19 elements, including who advised and what they advised.
✓List the agreed documents affected and check a revised version exists.
✓Flag what a change record is missing, and hold it for the client.
Any write happens inside the boundaries agreed at implementation, never ahead of a signature.
Taking over the log the principal contractor maintains.
Signing a dutyholder compliance declaration.
Deciding that a safety occurrence is reportable.
Changes to category rules or approval thresholds.
Example output
One change, annotated
An RFI moves a question to its responder; this moves a change to the client who signs.
Change record · single controlled changeIllustrative example
Element
Proposed change
Agreed document
Draft category
Confidence
Consequence
External wall build-up
Insulation replaced with a board of the same reaction-to-fire class
FEF rev C
Notifiable — reg 26
93%
Notice before the change is carried out
As receivedTaken from the agreed documents and the golden thread as they stand — nothing on this side is written by the agent.
What was readFire and emergency fileApproved wall build-upProduct classification
Why this categoryThe replacement is not of a lower class, so reg 26 puts it below a major change — the client settles it.
ActionAdoptRecategoriseSend to principal designer
What the score decidesBelow the configured threshold the change picks up a principal designer read before the client sees it.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every proposed changeFrom the agreed documents
03Recording
Draft against the approved set
Read the change against the agreed documents BSR approved, not against the latest drawing in the model.
01Approved path
The client signs each change
Routine recordable changes arrive already written up against reg 19.
02Human review
Send review to the ones that stop work
Notifiable and major drafts are marked, so the client's read starts where the prohibition bites.
04Build an evidence trail
The change, the advice it drew on and the client who signed stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Golden thread and agreed documentsZutec · Operance Asite · Autodesk ACC
Design and coordinationAutodesk Revit · Navisworks Solibri · Bluebeam Revu
Project and change managementProcore · Aconex Viewpoint · Fieldwire
Agent
Building safety change control
Reads the documents Drafts the record Holds for the client
Submission and handoverBSR online applications Reg 38 handover pack
A project-level change-record completeness figure can read well while a few change types carry the missing elements. BSR publishes nothing at all on change control, so Nestack reports yours by slice.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Product substitutions
9.6%
3.7×
Review
External wall changes
7.5%
2.9×
Review
Dutyholder changes
4.2%
1.6×
Watch
Internal refurbishment
1.6%
0.6×
Normal
Bar: missing-element-rate lift vs. an internal-refurbishment baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
The loop ends in a regression case
A cycle closes when the unrecorded change is a regression case. That suite is what the next change worked is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Missing-element rate rises in a change type.
02Diagnose
The detail that moved after the approval it was drawn against is traced back to one step.
03Improve
The change ships numbered, and the projects that forced it ride with it.
04Verify
Nothing releases while one touched change case is still red.
05Learn
It is kept for good, and the category rules are amended in the same commit.
Learn → DetectThe return edge. Every later detection meets a suite that is one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, change workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Change-control discovery and boundary definition.
02Golden-thread and CDE source assessment.
03Agreed-document and reg 26 category rule mapping.
04Change ingestion and document matching.
05Category drafting and reg 19 assembly.
06Confidence scoring and change routing.
07Client review workflow.
08Golden-thread and CDE integration.
09Category and consultation cases.
10Guardrails and recording controls.
11Change-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne project, one change logProductionProduction golden-thread systemsAdvancedMultiple projects / clients
Introduced at Pilot
Drafting to your agreed documents✓✓✓
Client review gate✓✓✓
Consultation-record baseline✓✓✓
Introduced at Production
Reporting by building—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Design-register integration—✓✓
Introduced at Advanced
Multi-building rule sets——✓
Multi-stage dutyholder review——✓
High change volume——✓
Multi-project change controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, change volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your agreed documents and change control plan→Agreed-document mapping and change ingestionWeek 1
02Representative changes and their records→Category-drafting baseline and reg 19 element assemblyWeek 2
03Your reg 26 category rules and decision procedure→Category-rule mapping and automation-boundary definitionWeek 1
04Access to relevant APIs, feeds or exports→Golden-thread and project system assessment, then integration setupWeek 2
05Change records you would not want pulled→Category cases and failure-mode testingWeek 4
06What no change record may omit→Confidence scoring, change routing, guardrails and approval controlsWeek 3
07Named client signatories to review drafts→Client review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band here is sized to the weeks its own phase absorbs, so the fifth honestly carries a pair.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Change-control discovery, rule mapping and the automation boundaryW2Source integration and the category-drafting baselineW3Reg 19 assembly, confidence logic and review controlsW4Evaluation suite, guardrails and failure-mode testingW5Golden-thread integration, pilot changes and targeted correctionsW6One change cycle run under the client duty-holder, then Agent Care handover
Reading the bandA bar spans the weeks its own work is named in. The week 5 overlap is worked time, not padding.
At the end of W6Validation closes on live changes, and Agent Care picks up the watch.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Construction AI agent
Build a change-control agent around the record reg 19 already prescribes.
The Lords committee found in December 2025 that applications are rejected for an inability to evidence how safety was considered. On a higher-risk building in England, reg 19 already prescribes that record and reg 18 forbids proceeding without it.