Research-Oversight & Attestation Evidence AI Agent
Track which projects belong to which review body, build the evidence pack behind a required attestation, and hold it for the named principal investigator — who determines the classification and signs it.
A proposal is drafted, and the agent sweeps it in — Executive Order 14292 (2025) does not stop at federal awards.
02
A sponsor deadline approaches, and the agent shows whether the attestation it needs exists and who owes it.
Reason
03
A project changes shape, and the agent reopens scope against the review body it was first scoped to.
04
A registration approaches the three-year limit in 42 CFR 73.7(l), and the agent shows the work behind it.
05
An amendment is filed, and the agent holds it as a blocking gate until approval returns — not as submitted.
Decide
06
A person is approved for access, and the agent starts the training clock on the earlier of the two dates.
07
A drill or plan review falls due, and the agent counts the security, biosafety and incident plans separately.
Out
08
A project closes, and its pack, its open items and the register it sat in are retained against the award.
09
Execute write actions only inside the approval boundaries agreed during implementation.
→Product statement
The agent assembles the record and runs the clocks; a named principal investigator attests and a named institutional official certifies.
Example workflow
One proposal, scope to attestation
AgentHuman
1Proposal receivedGrants system, contract record, philanthropic gift or internal project registration
2Record assembledFunding source, sites, agents in use, registrations and training, each with its named source
3Evidence pack draftedScope questions, the review body, open items and confidence
4Controls appliedScope-sweep checks, registration and training currency, blocking amendments and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is attested or certified at any of them — the agent is assembling, and the investigator's lane opens at the confidence gate.
5DecisionBranches at the confidence threshold
High confidence
Goes to the principal investigator to read.
Low confidence
Adds a biosafety officer read first.
Investigator review
The pack is held with its sources, its open items and the confidence.
Approve · Edit · Send to the biosafety officer
Approved — released for attestation▼
6Oversight registers updatedOnly where write access and approval policy allow it
7Outcome evaluatedPack completeness, open-item outcomes, review-body turnaround and post-award corrections
Edits
Every investigator edit is counted, and so is every correction made after the award.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required8 items
Determining whether a project is dangerous gain-of-function research.
Pre-filling, scoring or ranking a DGOF or IROC field.
Summarising, drafting or completing experimental methodology.
Attesting in writing to a classification.
Automation boundaryAgent acts unaided
✓Sweep the portfolio for projects that may be in scope.
✓Assemble the registration, training and inventory.
✓Run the registration, access, training, drill and reporting clocks.
✓Flag what needs review, and hold the pack for the named investigator.
Any write happens inside the boundaries agreed at implementation, never ahead of an attestation.
Certifying that an application is accurate and truthful.
Recording that a project does not need review.
Notifying CDC or APHIS of a theft, loss or release.
Changes to scope, registration or attestation rules.
Example output
One evidence pack, annotated
The pack is what the investigator reads before signing, and what is read back afterwards.
Evidence-pack output · single proposalIllustrative example
Project
Flag raised
Review body
Source of record
Confidence
Attribution
Non-federally funded study
The performance site changed after the review this project was scoped against
IBC · IRE
Subaward amendment
93%
Named investigator and role
As receivedTaken from the proposal record and the registration file — nothing on this side is written by the agent.
Evidence usedRegistration amendmentSubaward site recordIBC approval on file
Why this was flaggedIt flags a project for review and never clears one; a person decides.
ActionApproveEditSend to the biosafety officer
What the score decidesBelow the configured threshold the pack picks up a biosafety officer read first.
Value
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value landsValue 01 – 04
Every projectFrom the proposal record
03Assembly
Assemble from the record
Draw on registrations, approvals, training records and inventories — never on protocols, a corpus that is dual-use in itself.
01Approved path
Flag it, never clear it
Registration, training and inventory evidence arrives gathered, with the clocks that expire it.
02Human review
Aim the review at what was missed
Projects that may be in scope are flagged for the review body; the agent never records that one does not need review.
04Build an evidence trail
The project, the review body it belongs to and the official who certified stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Grants & proposalsCayuse · InfoEd Huron · Kuali Research
Committee systemsIBC and IRE modules Key Solutions · iRIS
Training & accessCITI Program records Badge and access logs
Agent
Research oversight & attestation
Reads the record Assembles the pack Holds for the PI
A whole-institution figure can hide one review body
An institution-wide scope-coverage figure can look acceptable while a few project cohorts absorb most of the rework behind it. Nestack reports the pack-rework rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Non-federally funded projects
7.8%
3.6×
Review
Foreign subaward sites
5.6%
2.6×
Review
Select-agent registered work
3.5%
1.6×
Watch
Single-site IBC projects
1.4%
0.7×
Normal
Bar: pack-rework-rate lift vs. the single-site IBC baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Each cycle leaves one more standing case
A cycle is done when the unreviewed project has become a case the next release must pass. That suite is what the next attestation prepared is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Pack-rework rate rises in a project slice.
02Diagnose
The project that changed shape after the review it was scoped against is read back until the cause narrows to one.
03Improve
Number the change; the projects that drove it are filed under it.
04Verify
Each touched register case is run once more, and one red holds it back.
05Learn
It stays as a standing test, and the scope rules move with it.
Learn → DetectThe return edge. The next proposal is worked against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, oversight workflow, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Oversight workflow and scope-boundary definition.
02Grants and committee source assessment.
03Scope-rule, registration and currency-clock mapping.
04Project-record ingestion and mapping.
05Register logic and record binding.
06Confidence scoring and pack routing.
07Investigator review workflow.
08Proposal and committee-system integration.
09Scope and currency cases.
10Guardrails and attestation controls.
11Register-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne programme, one committeeProductionProduction oversight systemsAdvancedMultiple programmes / sites
Introduced at Pilot
Scope sweeps to your rules✓✓✓
Investigator review✓✓✓
Scope-coverage baseline✓✓✓
Introduced at Production
Reporting by review body—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Proposal-system integration—✓✓
Introduced at Advanced
Multi-agency oversight rules——✓
Multi-stage committee approvals——✓
High proposal volume——✓
Multi-programme oversight controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, proposal volume, review controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your project list and funding sources→Project-record ingestion and mappingWeek 1
02Representative past proposals and packs→Register baseline, scope extraction and record bindingWeek 2
03Your scope, registration and currency rule sources→Scope-rule, registration and currency-clock mappingWeek 1
04Access to relevant APIs, feeds or exports→Grants, committee and training assessment, then integration setupWeek 2
05Registers you would not want audited→Scope cases and failure-mode testingWeek 4
06What no attestation may assume→Confidence scoring, pack routing, guardrails and attestation controlsWeek 3
07Named investigators to read packs→Investigator review workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The plan sits on elapsed weeks rather than on slide space, so the overlap in week five is real.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Oversight workflow discovery, rule mapping and the scope boundaryW2Grants, committee and training integration and the register baselineW3Oversight workflow, confidence logic and investigator-review controlsW4Evaluation suite, scope-rule checks and failure-mode testingW5Registration-system integration, pilot projects and targeted correctionsW6One award cycle run under the institutional official, then Agent Care handover
Reading the bandA bar covers the weeks its work is named in, and nothing else. The week 5 overlap is real, not padding.
At the end of W6When the register validates, Agent Care takes the agent on.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Biotechnology AI agent
Build an oversight agent that points at the project nobody sent to review.
The framework most institutions were scoped against was superseded on 5 May 2025 and not replaced until 28 July 2026, with agency implementation guidance still unissued as at 20 August 2026 — so we build on 42 CFR Part 73 and the NIH Guidelines and re-point the rest as it lands. Show us your proposal pipeline, your registrations and who signs, and we will map the scope sweep, the attestation register and the clocks. This sits before an experiment is designed: it governs whether work needs review and by whom, not how an approved campaign is planned or run.