Nestack Agent Care
Industries / Banking / Resilience agent

Banking AI agent · Incident reporting

Operational-Resilience & Incident-Reporting AI Agent

Track each regime's clock from the event that actually starts it, assemble the notification pack from one incident record, and hold it for the officer who determines and notifies.

4–6 weeksTypical delivery
Your stackDeployment
Multi-regimeOfficer decides
Agent CareAfter launch

What this agent does

Watches the clocks, not the decision to notify

In
01

An outage begins, and the agent opens one incident record from the monitoring, bridge and ticketing sources.

02

A first-awareness moment is fixed to a source — a status page, an alert or a person — not to a ticket stamp.

Reason
03

A threshold is met, and the agent shows which limb of 12 CFR 53.2 the facts reach and which they do not.

04

An officer records the determination, and the 36-hour clock in 12 CFR 53.3 is stamped from that moment.

05

A DORA classification is made by a named owner; the four-hour and 24-hour clocks in RTS (EU) 2025/301 both run.

Decide
06

A deadline lands on a Sunday, and no extension is applied — credit institutions are excluded from that relief.

07

A notification pack is assembled per regime, each against its own threshold — never one template for two.

Out
08

A later report falls due — intermediate, final, or the certification the executive and the CISO both sign.

09

Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The officer determines and notifies; a late notice is the bank's breach under 12 CFR 53.3, and the agent's log is evidence in that review.

Example workflow

One event, awareness to notification

AgentHuman
1Event detectedMonitoring alert, incident bridge, service desk or provider notice
2Facts assembledServices affected, first-awareness time, duration and clients touched, each with its source
3Thresholds testedRegime limbs met, limbs unmet, open questions and confidence
4Controls appliedRegime-threshold checks, clock-anchor checks, weekend-extension rules and confidence threshold
No human action required

Stages 1 to 4 run unaided, and no clock is started at any of them — the agent is assembling, and the officer's lane opens at the confidence gate.

5DecisionBranches at the confidence threshold
High confidence

Goes to the resilience officer to determine.

Low confidence

Adds a legal and compliance read first.

Officer determination

The pack is held with its facts, the limbs it meets and the confidence.

Accept · Amend · Send to legal review
Determined — the officer notifies
6Incident record updatedOnly where write access and approval policy allow it
7Outcome evaluatedClock anchors, elapsed time to notification, amendments and regulator follow-ups
Amendments

Every officer amendment is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required8 items
Notifying the OCC, the Board, the FDIC or any authority.
Determining that a notification incident has occurred.
Classifying an incident as major under DORA.
Signing the NYDFS certification — it takes two names.
Automation boundaryAgent acts unaided
Assemble one incident record and stamp what was known when.
Track each regime's clock from the event that starts it.
Test the record against the configured regime thresholds.
Flag what the pack is missing, and hold it for the officer for the named owner.
Any write happens inside the boundaries agreed at implementation, never ahead of the officer.
Approving the impact tolerances or the self-assessment.
Concluding the securities materiality question.
Authorising or disclosing an extortion payment.
Changes to threshold, clock or escalation rules.

Example output

One incident, annotated

The FCA's March 2026 review named missing document review trails — this is that layer.

Notification pack · single incidentIllustrative example
Incident
Threshold limb reached
Time remaining
Regime and clock
Confidence
Clock anchor
Payment-rail degradation
Materially degraded a business line — card authorisation
31h 12m left
12 CFR 53.3 · 36 hours
93%
Officer determination, on record
As receivedTaken from the incident record and the bridge log — nothing on this side is written by the agent.
Evidence held Bridge log entry Service-impact telemetry Provider notice
Why this clockIt runs from the officer's determination, not from detection.
ActionAcceptAmendSend to legal review
What the score decidesBelow the configured threshold the pack picks up a legal read before it reaches the officer.

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value landsValue 01 – 04
Every eventFrom the incident record
03Assembly

Assemble from the record

Draw on the incident record and the regime thresholds configured for the bank.

01Approved path

The clock starts at determination

No public action has yet been brought for a missed 36-hour notice; the record is the exposure.

02Human review

Send review to the contested calls

Borderline thresholds and low-confidence packs are marked, so the officer's read starts where the argument is.

04Build an evidence trail

The event, the threshold it was measured against and the officer who notified stay on the record.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

Monitoring and observabilityDatadog · Splunk
Dynatrace · Elastic
Incident managementPagerDuty · ServiceNow
Opsgenie · xMatters
GRC and riskArcher · MetricStream
ServiceNow IRM · OneTrust

Agent

Operational resilience & incident reporting

Reads the record
Tracks the clocks
Holds for the officer

Resilience and continuityFusion · Castellan
Riskonnect · Everbridge
Observability & evaluationOpenTelemetry · Langfuse
Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six layers between the model and the notification

Each of the six sits within the last. What none of them stops appears in the map beneath this.

L6 · Outermost — last line of defenceInward → L1 · closest to the model
L6Rollback / safe modePull assembly back to timeline-only when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt, threshold-rule and regime-configuration changes.Track
L4TraceabilityRecord the facts, the clock anchors, the amendments and the notification time.Record
L3Officer determinationHold packs for the named officer; it governs release, not whether the officer's call is right.Gate
L2Policy guardrailsTest packs against the configured regime thresholds and clock anchors; a failure returns the pack.Restrict
L1Confidence thresholdsRoute low-confidence packs to a legal read before the officer sees them.Require review
Model corePack produced — regime, clock anchor, limbs met, gaps and confidence
L1 – L2Test whether a pack may stand
L3Puts the determination in an officer's hands
L4 – L5Keep the event and the threshold behind it
L6Narrows to timeline assembly when signals degrade

How Nestack evaluates it

Evaluate the reporting workflow — not only the notice that went out.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the notice the regulator reads
Depth of coverage ▼
E1Final-output evaluationDid every fact in the pack match the incident record?
E2Step-level evaluationDid the agent use the right regime, threshold and clock anchor?
E3Tool evaluationDid it read the correct incident and the correct source system?
E4Confidence calibrationDo low-confidence packs actually attract more officer amendments?
E5Slice evaluationHow does performance change across specific reporting duties?
E6Business outcomeHow many packs needed an officer amendment or a later correction?
Floor — the outcome the bank answers for

Failure modes

Where each failure originates in the agent

Seven failure modes, placed at the stage each one originates.

Agent lifecycleDirection of processing →
01 · Retrieval1 mode
OR-03

Awareness time misread

First awareness taken from the ticket, not the earlier alert.

Stage gathersIncident record, bridge log, provider notices and rules
02 · Reasoning2 modes
OR-04

Severity scale mapped

A Sev-3 rail degradation never reaches the business-line limb.

OR-06

Stale hypothesis repeated

An intermediate report repeats a root cause already disproved.

Stage proposesRegime limbs, gaps, clock anchor and confidence
03 · Tool / write2 modes
OR-02

Clock started by the tool

A classification time no named owner can stand behind.

OR-05

Weekend extension applied

A credit institution is expressly excluded from that relief.

Stage writesOnly where write access and approval policy allow it
04 · Output1 mode
OR-01

Countdown from detection

A clock is displayed that the determination never started.

Stage returnsThe pack the officer notifies the regulator with
05 · Change / Version1 mode
OR-07

Silent threshold drift

A model or rule change narrows what the agent raises.

Stage tracksModel, prompt, threshold rules and regime config
Sev-1 · pack acted on outside the boundary Sev-2 · a wrong clock reaches the officer Sev-3 · source degrades, pack routes to review

Affected slices

A late notification is never evenly spread

A group-level on-time rate is set by the regime with the longest clock, while the shortest clocks carry the misses. Nestack reports the late-notification rate by regime, not only in total.

Slice performance — reported separately, not only in aggregateIllustrative example
SliceFailure rateLift Lift vs. thresholdStatus
DORA initial notification8.9%3.9× Review
Extortion-payment notice6.3%2.7× Review
NYDFS 72-hour notice4.2%1.8× Watch
US 36-hour notification1.7%0.7× Normal
Bar: late-notification-rate lift vs. US 36-hour baseline · scale 0–4.0× · tick marks the 2.0× review threshold 2 of 4 slices over threshold

Evidence-linked improvement

Each cycle closes with a new clock case

A cycle is done when the missed notification has become a case the next release must pass. That suite is what the next event worked is measured against.

Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect

Late notifications rise in one regime.

02Diagnose

The outage where nobody could say when the bank decided it counted is traced back to one cause — a determination made verbally at 02:40.

03Improve

Stamp the change; the events behind it are filed against that number.

04Verify

Each touched case is run once more, and one red holds the release back.

05Learn

It stays as a standing test, and the threshold rules move with it.

Learn → DetectThe return edge. The next detection runs against a suite one clock case longer.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, reporting workflow, evaluation, integration, then production validation and handover.

Workstream Week 1Week 2Week 3Week 4Week 5Week 6
01Incident workflow discovery and boundary definition.
02Monitoring and incident-source assessment.
03Regime threshold, clock-anchor and escalation mapping.
04Event-record ingestion and normalisation.
05Clock tracking and threshold logic.
06Confidence scoring and escalation routing.
07Officer determination workflow.
08Incident-platform and GRC integration.
09Threshold and notification cases.
10Guardrails and escalation controls.
11Event-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tier PilotOne regime, one entity ProductionProduction incident systems AdvancedMultiple regimes / entities
Introduced at Pilot
Assembly to your record and thresholds
Officer determination
Timeline-completeness baseline
Introduced at Production
Reporting by regime
Determination workflow in your systems
Approved write-back
Incident-platform integration
Introduced at Advanced
Multi-regime threshold rules
Multi-stage board approvals
High incident volume
Multi-regime notification controls
Build price From $5,000 From $8,000 Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

You bringWe build with it
01Your incident taxonomy and severity scale Incident-record ingestion and fact mappingWeek 1
02Representative past incidents Timeline baseline, clock anchoring and source bindingWeek 2
03Your regime scope and threshold interpretations Regime threshold, clock-anchor and escalation mappingWeek 1
04Access to relevant APIs, feeds or exports Monitoring and incident-source assessment, then integration setupWeek 2
05Notifications you would not want dated Clock cases and the evaluation suiteWeek 4
06What no notification may omit Confidence scoring, escalation routing, guardrails and approval controlsWeek 3
07Named officers, and the two who sign on 15 April Determination workflow, then pilot and production validationWeeks 5–6
Nothing else is required Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

Phases sit on elapsed weeks rather than on slide space, which is why week 5 legitimately carries two.

Phase W1W2W3W4W5W6
Discovery W1
Build W2 – W3
Evaluate W4 – W5
Pilot & Launch W5 – W6
Week focus W1Incident workflow discovery, regime mapping and the automation boundary W2Source integration and the timeline baseline W3Reporting workflow, clock logic and determination controls W4Evaluation suite, threshold checks and failure-mode testing W5GRC integration, pilot incidents and targeted corrections W6One incident cycle run under the resilience officer, then Agent Care handover
Reading the bandA bar covers the weeks its work is named in, and nothing else. The week 5 overlap is real, not padding.
At the end of W6The final checks clear on live events and monitoring moves to Agent Care.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Banking AI agent

Build a resilience agent around the determination that starts the clock.

Show us your incident record and your regime scope. The notification stays with your named officer; the self-assessment stays with the board and the senior manager who answers for it.

Nestack Agents · Operational resilienceAGT-BK-14 · Agent Care available after launch