Feedstock Carbon-Intensity & 45Z Documentation AI Agent
Assemble the field practice records, mass-balance documentation and CI inputs your fuel producer needs, mark what is still missing, and hold every load for your grain originator to release.
A farm-wide record-completeness score can look acceptable while a small number of field cohorts carry most of the gaps. Nestack reports the open-gap rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Multi-farm aggregation pools
7.9%
3.7×
Review
Rented ground, split operators
6.3%
2.9×
Review
Fields under a second programme
3.9%
1.8×
Watch
Single-operator owned fields
1.1%
0.5×
Normal
Bar: open-gap-rate lift vs. single-operator-field baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
Nothing closes until a test exists
A cycle closes when the unsupported practice claim is a case the next release must pass. That is what the next load is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Open-gap rate rises in a field slice.
02Diagnose
The truckload that arrived without the field behind it is traced back, load by load, until one cause survives.
03Improve
The fix gets a number, and the loads that raised it are held against that number.
04Verify
No release while a touched practice case is outstanding; it reruns until green.
05Learn
The case stays for good, and the model version it was found against is recorded.
Learn → DetectThe return edge. The next load is documented against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, report assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Delivery-load discovery and documentation boundary work.
02Farm-record and grain-system assessment.
03Practice-record, format and currency-window mapping.
04Field-record ingestion and normalisation.
05Report assembly and record binding.
06Confidence scoring and gap routing.
07Originator release workflow.
08Farm and grain-system integration.
09Practice and mass-balance cases.
10Guardrails and documentation controls.
11Load-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne farm, one elevatorProductionProduction farm recordsAdvancedMultiple elevators / regions
Introduced at Pilot
Assembly to your records and rules✓✓✓
Originator release✓✓✓
Record-completeness baseline✓✓✓
Introduced at Production
Reporting by field—✓✓
Release workflow in your systems—✓✓
Approved write-back—✓✓
Farm-record integration—✓✓
Introduced at Advanced
Multi-programme rule sets——✓
Multi-stage originator approvals——✓
High delivery volume——✓
Multi-programme documentation controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your field records and delivery tickets→Field-record ingestion and practice mappingWeek 1
02Representative delivered loads→Assembly baseline, record indexing and source bindingWeek 2
03Your programme rules and the refiner's report format→Practice, format and currency mappingWeek 1
04Access to relevant APIs, feeds or exports→Farm-record and grain-system assessment, then integration setupWeek 2
05Loads you would not want audited→Verification cases and failure-mode testingWeek 4
06What no attestation may assert→Confidence scoring, gap routing, guardrails and release controlsWeek 3
07A named grain originator to release reports→Originator release workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The weeks are drawn from the harvest, so the fifth carries evaluation and the pilot together.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Load discovery, rule mapping and the automation boundaryW2Farm-record integration and the assembly baselineW3Report assembly, confidence logic and release controlsW4Evaluation suite, currency checks and failure-mode testingW5Grain-system integration, pilot loads and targeted correctionsW6One harvest delivered under the grain originator, then Agent Care handover
Reading the bandA band sits only on the weeks its work is named in. The week 5 overlap is real, not padding.
At the end of W6Validation closes on live loads and Agent Care picks up monitoring.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Agriculture AI agent
Build a CI documentation agent around the report your refiner needs.
Show us your field records and who releases to the refiner. Your agronomist signs that the budget fits the field — and DOE has not yet wired the USDA practices into 45ZCF-GREET.