Assemble the plot geolocation, production dates and legality evidence your EU buyer needs before it declares, mark what the pack still lacks, and hold every consignment for your export lead.
A shipment-level plot-coverage rate can look acceptable while a small number of commodities carry most of the gaps. Nestack reports the open-gap rate by slice, not only in total.
Slice performance — reported separately, not only in aggregateIllustrative example
Slice
Failure rate
Lift
Lift vs. threshold
Status
Cattle traced to birth premises
9.3%
3.8×
Review
Blended bulk consignments
7.1%
2.9×
Review
Smallholder-sourced lots
3.8%
1.6×
Watch
Single-farm soya lots
1.1%
0.4×
Normal
Bar: open-gap-rate lift vs. single-farm-soya baseline · scale 0–4.0× · tick marks the 2.0× review threshold2 of 4 slices over threshold
Evidence-linked improvement
The loop shuts on a test, not an explanation
A cycle is done when the unmapped plot has become a case the next release must pass. That is what the next pack is measured against.
Improvement cycle · five stagesSwitchback — the path turns at Improve and returns at Learn
01Detect
Open-gap rate rises in a commodity slice.
02Diagnose
The plot nobody could put a boundary around is read back through its tickets until one cause is left.
03Improve
Stamp the change with a version; the consignments behind it travel with the note.
04Verify
The touched cases are rerun, and one failure is enough to stop the release.
05Learn
It stays as a standing test, and the sourcing rules are rewritten alongside it.
Learn → DetectThe return edge. The next gap is caught against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, pack assembly, evaluation, integration, then production validation and handover.
WorkstreamWeek 1Week 2Week 3Week 4Week 5Week 6
01Consignment-workflow discovery and origin boundary definition.
02Origin, grain and traceability assessment.
03Geolocation, threshold, format and country-risk mapping.
04Delivery-record ingestion and plot mapping.
05Pack assembly and evidence binding.
06Confidence scoring and gap routing.
07Export-lead release workflow.
08Origin and trade-system integration.
09Plot and traceability cases.
10Guardrails and declaration controls.
11Consignment-trail instrumentation.
12Deployment, documentation and Agent Care handover.
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallelFinal scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
Capability✓ in scope · — not at this tierPilotOne commodity, one originProductionProduction origin systemsAdvancedMultiple commodities / origins
Introduced at Pilot
Assembly to your records and rules✓✓✓
Export-lead release✓✓✓
Plot-coverage baseline✓✓✓
Introduced at Production
Reporting by commodity—✓✓
Release workflow in your systems—✓✓
Approved write-back—✓✓
Origin-system integration—✓✓
Introduced at Advanced
Multi-origin sourcing rules——✓
Multi-stage export approvals——✓
High consignment volume——✓
Multi-origin traceability controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build priceConfirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from buildBuild pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bringWe build with it
01Your delivery records and plot register→Delivery-record ingestion and plot mappingWeek 1
02Representative shipped consignments→Assembly baseline, evidence indexing and plot bindingWeek 2
03Your buyers' pack format and contract terms→Geolocation, threshold and format mappingWeek 1
04Access to relevant APIs, feeds or exports→Origin, grain and traceability assessment, then integration setupWeek 2
05Consignments you would not want declared→Origin cases and the evaluation suiteWeek 4
06What no consignment may ship without→Confidence scoring, gap routing, guardrails and release controlsWeek 3
07A named export lead to release packs→Export-lead release workflow, then pilot and production validationWeeks 5–6
Nothing else is requiredDeployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases sit on the weeks they truly take, so the overlap in week 5 is real work, not slack.
PhaseW1W2W3W4W5W6
DiscoveryW1
BuildW2 – W3
EvaluateW4 – W5
Pilot & LaunchW5 – W6
Week focusW1Consignment discovery, rule mapping and the automation boundaryW2Origin integration and the assembly baselineW3Pack assembly, confidence logic and release controlsW4Evaluation suite, plot and cut-off checks and failure-mode testingW5Trade-system integration, pilot consignments and targeted correctionsW6One shipping season assembled under the export lead, then Agent Care handover
Reading the bandEach band covers only the weeks its work is named in. The week 5 overlap is real, not padding.
At the end of W6The final checks clear on live consignments and monitoring moves to Agent Care.
DurationSix-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Agriculture AI agent
Build an EUDR pack agent around your buyer's declaration.
Show us your delivery records, your plot register and who releases to the buyer. The statement, and the responsibility that comes with submitting it, stay with the EU operator.